My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-28_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2010-04-28_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:57 PM
Creation date
4/28/2010 1:04:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
4/28/2010
Doc Name
Revised Cost Estimate (Memo)
From
Jim Stark
To
Sandy Brown, Dan Mathews
Type & Sequence
SL2
Email Name
SB1
DTM
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 28-Apr-10 Permit C-1982-057 Site: Seneca II-W M ine <br />User: JRS State : Colorado <br /> Filename: C057-00h County: Routt <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Partial Phase I Bond Release SL-02 <br /> Topsoil Replacement Tasks - Tasks 076-085 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />076 Replace Topsoil from Stockpile ZZ to Final Pit Area 82.84 $115,407 <br />077 Replace Topsoil from Stockpile A to TAHR Stations 144+00 to 216+00 38.61 $53,796 <br />078 Replace Topsoil from Stockpile C to TAHR Stations 92+00 to 144+00 31.74 $44,217 <br />079 Replace Topsoil from Stockpile D to TAHR Stations 76+00 to 92+00 10.99 $15,318 <br />080 Replace Topsoil from Stockpile E to TAHR Stations 40+00 to 76+00 17.79 $24,790 <br />081 Replace Topsoil from Stockpile F to TAHR Stations 16+00 to 40+00 8.01 $11,156 <br />082 Replace Topsoil from Stockpile G to TAHR Stations 0+00 to 16+00 5.21 $7,263 <br />083 Replace Topsoil from Stockpile AAA to Final Pit Area 117.22 $163,304 <br />084 Replace Topsoil from Stockpile DDD to Final Pit Area 42.58 $59,318 <br />085 Replace Topsoil from Stockpile EEE to Final Pit Area 37.83 $52,706 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 392.82 $547,275 <br />irs page 8 of 13 28-04-10
The URL can be used to link to this page
Your browser does not support the video tag.