My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-28_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2010-04-28_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:57 PM
Creation date
4/28/2010 1:04:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
4/28/2010
Doc Name
Revised Cost Estimate (Memo)
From
Jim Stark
To
Sandy Brown, Dan Mathews
Type & Sequence
SL2
Email Name
SB1
DTM
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br /> Bill Ritter, Jr. <br /> Governor <br />INTEROFFICE <br /> James B. Martin <br />MEMORANDUM Executive Director <br /> Loretta E. Pineda <br /> Director <br />TO: Sandy Brown, Dan Mathews <br />FROM: Jim Stark 75??? <br />SUBJECT: Revised Seneca II-W Mine's SL-02 Cost Estimate <br />DATE: 28 April 2010 <br />Attached is the revised reclamation cost estimate for the Seneca II-W Mine's Partial <br />Phase I Bond Release SL-02. The revision is based on an additional 15 acre exclusion <br />area and changes to several of the road reclamation sheets. The replacement task sheets <br />are the summary sheet, the indirect cost summary sheets (tasks 00a-00m), 002, 08a (a <br />new task to make the remaining work on the A Pit highwall more clear), 009, 010, 025, <br />028, 029, 030, 031 and 035. These task sheets (dated 28 April 2010) will replace the task <br />sheets in the current SL-02 estimate (dated 15 March 2010). <br />This revised estimate represents a new liability of $9,078,860.00. This estimated liability <br />is based on the work remaining following the release of liability associated with SL-02. <br />All costs have been updated to current costs in this estimate. <br />The amount the Division can release as a result of SL-02 is $2,038,488.00. Based on the <br />current bond amount of $11,117,348.00, the Division will be releasing 18.34% of the <br />bond. This amount is lower than the $4,864,928.00 requested by SCC due to the South <br />Exclusion Area and other exclusion areas as noted on the Phase I Bond Release Map. <br />This South Exclusion Area contained 43.5% of the area referred to as the South Wadge <br />Pit in the estimate as well as the Wolf Creek/Sage Creek Pit and the South Sage Creek <br />Pit, along with their associated drainage channels. <br />The areas that were included in this release estimate were the A Pit (with the exception of <br />repair work on the highwall slump area) and the 56.5% of the South Wadge Pit that was <br />not in the South Exclusion Area. This release also included all of the drainages in the <br />release area that were not in the exclusion areas shown on the Phase I Bond Release <br />Exclusion Map and reclamation for some of the haul roads and light-use roads, again not <br />in the exclusion areas. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines