Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 242 <br />Date : 0410112010 <br />User: JRS <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Delta <br />Site: Bowie No. 2 Mine <br />Permit/job# : C- 1996 -083 <br />Abbreviation :none <br />Filename : C083 -242 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />1.00 <br />Permit or other job action :Minor Revision 116 <br />Job efficiency : <br />Task description: Replace Topsoil from Stockpile to Terror Creek Light -Use Road <br />(1s_hift1day) <br />Spoil pile: <br />HOURLY EQUIPMENT COST <br />(fnd -o <br />Basic machine: Cat D9R - 9SU (2005) Horsepower:-- <br />405 <br />Blade type: Semi - Universal <br />Altitude : <br />Attachment no. 1 : ROPS Cab Shift basis : <br />1 per day <br />Attachment no. 2 :3 -shank ripper <br />0.90 <br />Data source: <br />(CRG) <br />1.00 <br />Utilization % <br />Net correction : <br />Cost Breakdown: Ownership cost/hour : $67.77 <br />NA <br />Adjusted unit production : <br />Operating cost/hour : $95.29 <br />100 <br />Adjusted fleet production : <br />Ripper op. cost/hour : $0.00 <br />0 <br />Total job time : <br />Operator cost/hour : $38.54 <br />NA <br />Total job cost: <br />Total unit cost/hour : $201.60 Total fleet cost/hour : <br />$201.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 7,400 CCY factor : 1.125 volume : 8,325 <br />LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor: CAT Handbook <br />HOURLY PRODUCTION Job <br />Average push distance : 125 feet <br />Unadjusted hourly production : 1,055.6 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient: 5.00 % (pos) <br />Average site altitude : 7,800 feet <br />Material weight: 2,550 Ibs /LCY <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.551 /LCY <br />dition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency: 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: <br />1.00 <br />_ (avg.) <br />Job efficiency : <br />0.83 <br />(1s_hift1day) <br />Spoil pile: <br />0.80 <br />(fnd -o <br />Push gradient: <br />0.90 <br />(Cat HB) <br />Altitude : <br />0.95 <br />(Cat HB) <br />Material weight: <br />0.90 <br />_(Cat HB) <br />Blade type : <br />1.00 <br />(S/SU /U) <br />Net correction : <br />0.35 <br />Adjusted unit production : <br />366.17 <br />LCY /hr <br />Adjusted fleet production : <br />366.17 <br />LCY /hr <br />Total job time : <br />22.74 <br />Hours <br />Total job cost: <br />$4,583 <br />