Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date : <br />26- Jan -10 <br />Permit <br />C -1996 -083 <br />Site: Bowie No. 2 Mine <br />User: <br />JRS <br />State : Colorado <br />Filename: <br />C083 -00a <br />County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br />Backfilling and Rough Grading Tasks - Tasks 001 -027 <br />Task <br />Task Description <br />TASK HOURS <br />DIRECT COST <br />001 <br />Pull Back and Haul Portal Bench Fill Material to Cut Slope <br />615.10 <br />$341,057 <br />002 <br />Regrade D -Portal Bench <br />157.94 <br />$162,108 <br />003 <br />Pull Up Material for Utility Corridor <br />27.56 <br />$11,994 <br />004 <br />Regrade Utility Corridor <br />4.48 <br />$4,601 <br />005 <br />Rip and Regrade Material Storage Area at Gob Pile <br />1.73 <br />$1,777 <br />006 <br />Pull Back Material at Old Truck Loadout Material Storage Area <br />23.48 <br />$10,220 <br />007 <br />Regrade Old Truck Loadout Material Storage Area <br />8.20 <br />$8,420 <br />008 <br />Pull Back Material at Truck Loadout/Coal Stockpile <br />162.92 <br />$70,900 <br />009 <br />Regrade New Truck Loadout and Coal Stockpile <br />32.39 <br />$33,242 <br />010 <br />Pull Material Back Onto Train Loadout Facilities and Railbed Benches <br />476.64 <br />$207,428 <br />Oil <br />Regrade Train Loadout Facilities and Railbed Benches <br />171.49 <br />$176,018 <br />012 <br />Backfill and Regrade Train Loadout Overland Conveyor Corridor <br />5.61 <br />$5,760 <br />013 <br />Haul Fill from Upper Material Storage Area to B -Seam Portal Bench <br />90.83 <br />$39,213 <br />014 <br />Haul Fill from Adjacent Material Storage Area to B -Seam Portal Bench <br />103.68 <br />$51,918 <br />015 <br />Backfill and Regrade B -Seam Portal Bench <br />38.73 <br />$39,749 <br />016 <br />Pull Material Back Onto Freeman Gulch Vent Shaft Bench <br />2.56 <br />$1,113 <br />017 <br />Push Material from Freeman Gulch Vent Shaft Back to Cut Slope <br />0.48 <br />$490 <br />018 <br />Regrade Freeman Gulch Vent Shaft Pad <br />8.42 <br />$8,642 <br />019 <br />Regrade Drill Pads from MR's and TR's <br />68.92 <br />$70,736 <br />020 <br />Regrade Material Storage Area from TR -29 <br />0.48 <br />$492 <br />021 <br />Backfill and Regrade New Prep Plant Bench <br />36.97 <br />$37,947 <br />022 <br />Replace Fill from Material Storage Area to Water Tank Bench <br />1.66 <br />$717 <br />023 <br />Regrade Borrow Area <br />19.15 <br />$19,656 <br />024 <br />Regrade Hubbard Creek Vent Shaft Pad <br />1.89 <br />$1,936 <br />025 <br />Regrade Upper Parking Lot Expansion Area <br />3.66 <br />$796 <br />026 <br />Haul Material from Bowie No. 1 Mine Stockpile to Hubbard Creek Vent Shaft <br />33.18 <br />$26,913 <br />027 <br />Haul Rock to Vent Shafts for Disposal <br />11.99 <br />$4,624 <br />Total Direct Cost <br />2,110.14 <br />1 $1,338,467 <br />jrs 26 -01 -10 <br />