Laserfiche WebLink
<br />Holcim (US) Inc. Phone 719-784-6325 <br />3500 State Hwy 120 Fax: 719-784-3470 <br />Florence, CO 81226 <br />Holcim www.holcim.com/us <br />April 22, 2010 <br />Mr. Jim Dupler <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Holcim (US) Inc., Coaldale Gypsum Mine (Permit It M-1977-247) 2009 <br />Annual Report <br />Dear Mr. Dupler: <br />Attached please find the 2009 annual report for the Coaldale Gypsum Mine in Map form. <br />Enclosed with the report is a check for $791.00, to cover the annual fees from April 28, <br />2010 through April 27, 2011. <br />During 2009 the Coaldale mine operated from March 23, 2009 through April 28, 2009. <br />The mine was idle from April 29, 2009 to February 1, 2010 In 2,010 the mine operated <br />from February 2, 2010 to March 26, 2010. The mine will remain idle for the remainder of <br />2010. Operations are expected to resume during the first quarter of 2011 for a period of <br />approximately 6 weeks. <br />Should you have any questions or need any additional information please feel free to <br />contact me at (719) 784-1209. <br />Thank you, <br />Joe Lamanna <br />Quarry Manager <br />Holcim (US) Portland Plant