My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-23_REPORT - M1977247 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977247
>
2010-04-23_REPORT - M1977247 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:26:35 AM
Creation date
4/26/2010 1:31:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
REPORT
Doc Date
4/23/2010
Doc Name
Annual Fee/Report/Map
From
Holcim
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Holcim (US) Inc. Phone 719-784-6325 <br />3500 State Hwy 120 Fax: 719-784-3470 <br />Florence, CO 81226 <br />Holcim www.holcim.com/us <br />April 22, 2010 <br />Mr. Jim Dupler <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Holcim (US) Inc., Coaldale Gypsum Mine (Permit It M-1977-247) 2009 <br />Annual Report <br />Dear Mr. Dupler: <br />Attached please find the 2009 annual report for the Coaldale Gypsum Mine in Map form. <br />Enclosed with the report is a check for $791.00, to cover the annual fees from April 28, <br />2010 through April 27, 2011. <br />During 2009 the Coaldale mine operated from March 23, 2009 through April 28, 2009. <br />The mine was idle from April 29, 2009 to February 1, 2010 In 2,010 the mine operated <br />from February 2, 2010 to March 26, 2010. The mine will remain idle for the remainder of <br />2010. Operations are expected to resume during the first quarter of 2011 for a period of <br />approximately 6 weeks. <br />Should you have any questions or need any additional information please feel free to <br />contact me at (719) 784-1209. <br />Thank you, <br />Joe Lamanna <br />Quarry Manager <br />Holcim (US) Portland Plant
The URL can be used to link to this page
Your browser does not support the video tag.