Laserfiche WebLink
b. 80 Million Clean Tons (entire potential reserve) <br />Site/ Physical Description: <br />1. Location, area, yardage and height of stockpile site(s): Refer to 2.05.3 MIA Mine Facilities <br />Map (South End) <br />a. Excavated material to be used in cut/fill balance for facilities pad <br />b. Coal Stockpile: Area = 6 Acres, Yardage = 330,000 CY, Stockpile Height = 90'. <br />2. Location and area of processing site(s): Refer to 2.05.3 MIA Mine Facilities Map (South <br />End) <br />3. Location and type of on-site facilities/structures: Refer to 2.05.3 MIA Mine Facilities Map <br />(South End) <br />4. Location of stockpiles for topsoil, overburden, etc.: Refer to 2.05.3 MIA Mine Facilities Map <br />(South End). <br />5. Acreage of all disturbed areas: Permitted (DRMS) Disturbance Area = 275.4 acres <br />6. Drainage control on site: Refer To Permit Map 2.05.3-M4 Drainage and Sediment Control Plan <br />7. Type of equipment on site: <br />a. Portal Excavation - truck, shovel/excavator. <br />b. Mining Equipment - The PSCM will use conventional mining methods and equipment <br />similar to that used in active underground coal mining operations in the Western United <br />States. A typical continuous miner section will consist of the following equipment: <br />• Continuous Miner(s) <br />• Shuttle Cars <br />• Roof-Bolter <br />• Feeder-Breaker <br />• Electrical Load Center <br />• Mantrip Vehicle(s) <br />• LHD Scoop(s) <br />• Parts Car <br />• Mobile Tail Piece <br />• Rock Duster <br />• Face Fans <br />• Miscellaneous Pumps and Tools <br />c. The following types of utility and support equipment (both underground and surface) <br />may also be utilized for the PSCM: <br />-9-