My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-20_REVISION - C1981010 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-04-20_REVISION - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:25 PM
Creation date
4/23/2010 3:24:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
4/20/2010
Doc Name
Map 1 Sheet 3 of 3 Phase I Bond Release Area Delineation
From
Trapper
Type & Sequence
SL11
Email Name
RDZ
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
400 <br />0 400 800 1200 <br />SCALE: 1 IN = 400 FT � f'L1 <br />CONTOUR INTERVAL: 10 FEET APR 20Z <br />Lf <br />&fln'ng a��d <br />APPROVED PHASE III BOND RELEASE BOUNDARY <br />-Date POWERLINE /TOPSOIL HAULAGE /DRAINAGE CORRIDORS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY SHEET LOCATION INDEX Topographic information compiled from oerial photography dated 10 /0e. <br />Minescape File: M: Proiects Envlronmen <br />GD -3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY ml su 1_phasel_ app <br />N 414000 <br />N 412000 <br />N 410000 <br />N 408000 <br />N 406000 <br />N 404000 <br />N 402000 <br />N 4 -00000 <br />TRAPPER MINING INC. <br />TRAPPER MINE CRAIG, CO. <br />SL -11 PHASE 1 <br />BOND RELEASE <br />AREA DELINEATION <br />Sheet 3 of 3 <br />SCALE: 1 " = 400' <br />DESIGNED BY: FMS MAP 1 <br />DRAWN BY: BDN,RDH <br />DATE: 2/07/10 SHEET 3 rrennar M.o= <br />— — -- — — PROPOSED <br />PHASE I <br />BOND <br />RELEASE BOUNDARY <br />. . ....... ".. PERMIT BOUNDARY <br />PROFESSIONAL <br />ENGINEER'S CERTIFICATION <br />— — — — APPROVED <br />PHASE 1 <br />BOND <br />RELEASE BOUNDARY <br />....... - °'� - - - - - - RECONSTRUCTED DRAINAGE <br />I, James M. Mattern, a registered Professional Engineer <br />in the <br />state of alo having reviewed this mop and <br />S <br />information by other experts. <br />_ _— <br />( � PROPOSED <br />PHASE II <br />BOND <br />RELEASE BOUNDARY <br />® EXISTING STOCK POND <br />based <br />certify <br />additional al provided <br />that the information is true and correct to the <br />best of <br />my knowledge and information. <br />_ C, ._ UL A APPROVED <br />PHASE II <br />BOND <br />RELEASE BOUNDARY <br />177-F w `r `' r PROPOSED PHASE <br />III Block A,D,H Pits, RSAB, 96 -98 <br />James M. Mottern, CO PE No. 20537 <br />400 <br />0 400 800 1200 <br />SCALE: 1 IN = 400 FT � f'L1 <br />CONTOUR INTERVAL: 10 FEET APR 20Z <br />Lf <br />&fln'ng a��d <br />APPROVED PHASE III BOND RELEASE BOUNDARY <br />-Date POWERLINE /TOPSOIL HAULAGE /DRAINAGE CORRIDORS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY SHEET LOCATION INDEX Topographic information compiled from oerial photography dated 10 /0e. <br />Minescape File: M: Proiects Envlronmen <br />GD -3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY ml su 1_phasel_ app <br />N 414000 <br />N 412000 <br />N 410000 <br />N 408000 <br />N 406000 <br />N 404000 <br />N 402000 <br />N 4 -00000 <br />TRAPPER MINING INC. <br />TRAPPER MINE CRAIG, CO. <br />SL -11 PHASE 1 <br />BOND RELEASE <br />AREA DELINEATION <br />Sheet 3 of 3 <br />SCALE: 1 " = 400' <br />DESIGNED BY: FMS MAP 1 <br />DRAWN BY: BDN,RDH <br />DATE: 2/07/10 SHEET 3 rrennar M.o= <br />
The URL can be used to link to this page
Your browser does not support the video tag.