Laserfiche WebLink
400 <br />0 400 800 1200 <br />SL -11 PHASE 1 <br />SCALE: 1 T - 400 FT BOND RELEASE <br />CONTOUR INTERVAL: 10 FEET APR 20 010 <br />AREA DELINEATION <br />1?I�ing <br />Sheet 2 of 3 <br />APPROVED PHASE IN BOND RELEAS <br />SCALE 1" = 400' <br />Date POWERLINE %TOPSOIL HAULAGE/DRAINAGE CORRIDORS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY SHEET LOCATION INDEX Topographic information compiled from aerial photography dated 10 /0s. <br />DESIGNED BY: FMS MAP 1 <br />0 GD -3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY Minescape File: M: \Proiects\EnvircnmentonSl _11_phaseI_cpp <br />DRAWN BY: BDN.RDH <br />DATE: 2/7/10 1 SHEET 2 <br />— — — — — — — PROPOSED <br />PHASE I <br />BOND <br />RELEASE BOUNDARY <br />------- - - - - -- PERMIT BOUNDARY <br />PROFESSIONAL ENGINEER'S CERTIFICATION <br />APPROVED <br />PHASE 1 <br />BOND <br />RELEASE BOUNDARY <br />RECONSTRUCTED DRAINAGE <br />I, James M. Mattern, a registered Professional Engineer <br />in the State of Colorado, having reviewed this map and <br />by experts. <br />- _,_ —� PROPOSED <br />PHASE II <br />BOND <br />RELEASE BOUNDARY <br />0 EXISTING STOCK POND <br />based on additional information provided other <br />certify that the information is true and correct to the <br />best of my knowledge and information. <br />I _ � _ � _ � _ APPROVED <br />PHASE II <br />BOND <br />RELEASE BOUNDARY <br />11 PROPOSED PHASE <br />III Block A,D,H Pits, RSAB, 96 -98 <br />James M Mattern. CO PE No 20537 <br />E BOUNDARY <br />400 <br />0 400 800 1200 <br />SL -11 PHASE 1 <br />SCALE: 1 T - 400 FT BOND RELEASE <br />CONTOUR INTERVAL: 10 FEET APR 20 010 <br />AREA DELINEATION <br />1?I�ing <br />Sheet 2 of 3 <br />APPROVED PHASE IN BOND RELEAS <br />SCALE 1" = 400' <br />Date POWERLINE %TOPSOIL HAULAGE/DRAINAGE CORRIDORS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY SHEET LOCATION INDEX Topographic information compiled from aerial photography dated 10 /0s. <br />DESIGNED BY: FMS MAP 1 <br />0 GD -3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY Minescape File: M: \Proiects\EnvircnmentonSl _11_phaseI_cpp <br />DRAWN BY: BDN.RDH <br />DATE: 2/7/10 1 SHEET 2 <br />1 <br />,,,,,,,,,,,, <br />-3 <br />Ij <br />>tl <br />400 <br />0 400 800 1200 <br />SL -11 PHASE 1 <br />SCALE: 1 T - 400 FT BOND RELEASE <br />CONTOUR INTERVAL: 10 FEET APR 20 010 <br />AREA DELINEATION <br />1?I�ing <br />Sheet 2 of 3 <br />APPROVED PHASE IN BOND RELEAS <br />SCALE 1" = 400' <br />Date POWERLINE %TOPSOIL HAULAGE/DRAINAGE CORRIDORS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY SHEET LOCATION INDEX Topographic information compiled from aerial photography dated 10 /0s. <br />DESIGNED BY: FMS MAP 1 <br />0 GD -3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY Minescape File: M: \Proiects\EnvircnmentonSl _11_phaseI_cpp <br />DRAWN BY: BDN.RDH <br />DATE: 2/7/10 1 SHEET 2 <br />