Laserfiche WebLink
TRAPPER MINING INC. <br />April 19, 2010 <br />Mr. Robert Zuber cewPD <br />Environmental Protection Specialist <br />i <br />i <br />i <br />S <br />f APR <br />L <br />on, M <br />ng & <br />a <br />ety <br />Colorado Division of Reclamat <br />n ;(? <br />1313 Sherman Street, Room 215 Mid-on o; <br /> <br />Denver, CO 80203 , <br />aW 4 <br />5 , n <br />Dear Mr. Zuber: <br />Res Trapper Mining Inc., Permit No. C-81-010 <br />Phase III Bond Release Application (SL-11) Response <br />Enclosed please find revised maps and several revised text pages to the above-referenced bond <br />release application package. The revisions are as follows: <br />• Map 1 (sheet 2 and 3) is revised to refelect changes to reclamation parcels Z-A-08 that <br />was disturbed for construction of fueling pad and ready line, resulting in a new parcel <br />acreage of 7.3. <br />• Narrative page 1 revised to reflect a bond release block reduction from 64.4 acres to 63.9 <br />acres. <br />• Reclaimed Parcel History sheet for Parcel Z-A-08 is revised to reflect an acreage reduction <br />from 7.8 to 7.3. <br />Please contact me if you have any questions or concerns regarding this correspondence. <br />Sincerely, <br />Graham Roberts <br />EHS Specialist <br />GCR <br />[SL-11 RLI.docl <br />End <br />c File 109.2.3.3 <br />SL-11 notebook <br />P.O. Box 187 Craig, Colorado 81626 (970) 824-4401