My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-23_PERMIT FILE - M2010004
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010004
>
2010-04-23_PERMIT FILE - M2010004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:39 PM
Creation date
4/23/2010 1:41:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010004
IBM Index Class Name
PERMIT FILE
Doc Date
4/23/2010
Doc Name
Adequacy Review
From
DRMS
To
LJ Development, Inc.
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 State : Colorado Permit/job #:M2010004 <br />Date : 0410712010 County :Huerfano Abbreviation :none <br />User: PSH Site : Leone Huerfano Gravel Pit Filename : M004-003 <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Permit or other job action :Leone Huerfano Gravel Pit Bond Estimate <br />Task description : Rip Compacted Areas <br />HOURLY EQUIPMENT COST <br />Basic machine: CAT 16H <br />Horsepower: 275 <br />Attachment no. 1 : NA Q) Shift basis : 1 per day <br />Attachment no. 2 : Multi-shank ripper . <br />Data source : (CRG) <br />Cost Breakdown Ownership cost/hour : <br />Grader operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour <br />Total unit cost/hour <br />Utilization % <br />$62.02 NA <br />$60.59 100 <br />$3.26 100 <br />$24.50 NA <br />$150.37 Total fleet cost/hour : <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 22.50 acres <br />Source of estimated acreage :Permit Application <br />HOURLY PRODUCTION <br />$150,37 <br />Selected application :Ripping (0-3 mph) <br />Average grader speed : 1.50 mph <br />Selected blade angle : NA degrees * • at 0 degrees, blade is perpendicular <br />Effective blade length : NA feet to direction of travel. <br />Width of blade overlap per pass : NA feet <br />Net grading or ripping width per pass : 9.75 feet ** *' width of ripper beam on ripping applicati ons <br />Unadjusted hourly unit production : 1.7727 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 6,200 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh1d, mod.) <br /> Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.5068 acres/hour <br />Adjusted hourly fleet production : 1.5068 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time: 14,93 hours <br />Unit cost : $99.79 per acre Total job cost : $2,245 <br />
The URL can be used to link to this page
Your browser does not support the video tag.