Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine 11-16 <br />• Ralston Creek Above Waste Dumps (SW-AWD) <br />Note: Log Scale <br />1 <br />• <br />• <br />0.1 <br />J <br />E <br />c <br />0 <br />t° <br />g 0.01 <br />00 <br />U <br />E <br />'c <br />7 <br />0.001 <br />0.0001 <br />Jan-89 Jan-91 Jan-93 Jan-95 Jan-97 Jan-99 Jan-01 Jan-03 <br />Ralston Creek Above Plant Discharge (SW-A001) <br />Note: Log Scale <br />1 <br />0.1 <br />J <br />EE <br />c <br />0 <br />A <br />0 0.01 <br />0 <br />c <br />E <br />0 <br />c <br />0.001 <br />0.0001 <br />Jan-89 Jan-91 Jan-93 Jan-95 Jan-97 Jan-99 Jan-01 Jan-03 Jan-05 Jan-07 Jan-09 Jarr11 <br />Figure 11-7. Uranium Concentrations in Ralston Creek at Upstream Stations SW-AWD and <br />SW-A001, 1990 -Mar 2010 <br />-11 <br />4109C.100419