My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-21_HYDROLOGY - C1981025 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981025
>
2010-04-21_HYDROLOGY - C1981025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:28 PM
Creation date
4/22/2010 2:38:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
HYDROLOGY
Doc Date
4/21/2010
Doc Name
2010 Annual Impoundment Inspection
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Prof Pond Certifications
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINREC, INC. <br />NORTH THOMPSON CREEK MINES <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly to determine <br />if the impoundment has been maintained as designed, and in accordance with the approved plan and <br />the applicable regulations. This yearly inspection is for the impoundments located at the North <br />Thompson Creek Mines. <br />On April 13, 2010 1 performed the required yearly inspections. I, J. E. Stover, have a wide variety of <br />experience in the design and construction of earth fill embankments. Nothing was observed during <br />the inspection that would indicate the ponds have a potential for failure. There was no appearance of <br />erosion, instability, structural weakness or other hazardous conditions. There are no required <br />monitoring procedures or instrumentation other than quarterly and yearly inspections. There are no. <br />aspects which might aff ect stability and there is no required maintenance. The long pond and <br />treatment ponds T-1 and T-2 were full as expected with approximate water level elevations of 7522, <br />7515 and 7511 respectively. T-2 was discharging into outfall 001 at approximately 15 gpm. Sediment <br />pond 9 contained about 1.0 feet of water at approximate elevation of 7497. Water depth in the long <br />pond is approximately 24". Water depth in the treatment ponds T-1 and T-2 is approximately 4 to 5- <br />feet. <br />The impoundments have the following capacities: <br />IMPOUNDMENT CAPACITIES - ACRE FEET <br /> Water Sediment Total <br />Long Pond 0.35 N/A 0.35 <br />T-1 0.29 N/A 0.29 <br />T-2 0.24 N/A 0.24 <br />Pond 9 0.53 0.42 0.95 <br />Notes: <br />1. Capacities are based latest digital topography. <br />To the best of my knowledge ar Ir??undments have been maintained as designed and in <br />accordance with the approve® c ancf ap? egulations. <br />® a m <br />0?o°? <br />o? <br />??rQ 1°2 0'' o <br />,pa s0 E. Stover oo ??,0, Date <br />Colora ® 1?f?ssi, sneer <br />Regist tl?l a?•?30
The URL can be used to link to this page
Your browser does not support the video tag.