My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-15_PERMIT FILE - P2010007 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010007
>
2010-04-15_PERMIT FILE - P2010007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:04:13 PM
Creation date
4/22/2010 2:21:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010007
IBM Index Class Name
PERMIT FILE
Doc Date
4/15/2010
Doc Name
New NOI Application (non-confidential)
From
Rio Grande Silver, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2 - Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil depth in the southern exploration area is estimated to range from zero to locally 12 inches. <br />VVI ie, e pi ese, it, topsoil will be salvaged ai id stockpiled at 1:1 ie upslope side of the di ill pads. 01 ice <br />the drill pail is rPrnntmirpri gnd_Sr2roflPri tha salvacied tnnap*l will hp roriic+rihiMari nvcr thn final <br />graded areas. For reclamation purposes, it is assumed that approximately 4 to 6 inches of topsoil <br />will be available for redistribution as growing medium. There is little to no topsoil present on the <br />abandoned county road in the northern explaratiern area, as the road was constructed from fill and <br />Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />n .° h i well h ahandnnarl in their Pntirety All drill holes will he completely filled with rnnrrte, <br />cement grout, or bentonite grout to prevent any vertical movement of groundwater within the drill <br />hole, as we as to eliminate a post-exp oration anger to people an wildlife that may traverse the <br />area. The eanerete or gretit will be plaeed 'bottorn-upward' in each drill hole. Drill holes Wi be <br />egged with a pre cast or in-situ cement plug or bridge, starting at about 3 feet below the top of <br />the bedrock surface. The plug will ensure that any settlement of the concrete or grout in the hole <br />will no affect the long-term a ec iveness an integrity o the plugging procedure. opsoi will be <br />SpFead eyeF the top ef the plug. <br />Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Nnt npnlirahlP <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Gates will be installed at the entrance to the temporary, low-standard access roads to close them <br />to motorized rave a e conclusion o the exploration program. Disturbed areas (roads and drill <br />disturbance Compacted areas will be loosened as necessary by ripping or discing and left in a <br />roughened condition prior to topsoil replacement and reseeding. Reclamation will include the <br />installation of water bars where necessary to prevent degradation of the recialmed area.
The URL can be used to link to this page
Your browser does not support the video tag.