Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine vi <br />• Figure 9-6. Depth Profiles for Temperature, pH, ORP, and E.C. in Mine Water, Nov 12, 2007 ............. 9-42 <br /> Figure 9-7. Time Concentration Plots for Solution Parameters (pH, ORP, TDS) in Mine Water ............ 9-44 <br /> Figure 9-8. Time Concentration Plots for Major Anions (HCO3, S04, and Cl) in Mine Water ................ 9-45 <br /> Figure 9-9. Time Concentration Plots for Major Cations (Ca, Mg, Na, K) in Mine Water ...................... 9-46 <br /> Figure 9-10. Time Concentration Plots for Metals (Fe, Mn) in Mine Water ............................................ 9-47 <br /> Figure 9-11. Time Concentration Plots for Trace Metals (U, Mo) in Mine Water ................................... 9-48 <br /> Figure 9-12. Piper Diagram Showing Major Ion Composition of Seepage into the Upper Mine Levels. 9-50 <br /> Figure 11-1. Change in TDS, Sulfate, Specific Conductance, Alkalinity, and pH in with Location in <br /> Ralston Creek, December 1998 ...........................................................................................11-10 <br /> Figure 11-2. Seasonal Variation in TDS Components in Ralston Creek ................................................ 11-11 <br /> Figure 11-3. Piper Diagram Showing Major Ion Composition of Ralston Creek Samples .................... 11-12 <br /> Figure 11-4. Trends in Major Ion Concentrations at Station SW-BPL, 1998 - 2010 ..............................11-13 <br /> Figure 11-5. Correlation of Uranium, Sulfate, Bicarbonate, and TDS Concentrations at SW-BPL....... 11-14 <br /> Figure 11-6. Trends in Uranium Concentrations at Stations SW-AWD, SW-A001, SW-BPL, SW-FBRG, <br /> SW-ARH, and SW-LLHG ...................................................................................................11-15 <br /> Figure 11-7. Uranium Concentrations in Ralston Creek at Upstream Stations SW-AWD and SW-A001, <br /> 1990 - Mar 2010 .................................................................................................................11-16 <br /> Figure 11-8. Uranium Concentrations in Ralston Creek at Downstream Stations SW-BPL and SW-FBRG, <br /> 1990 - Mar 2010 .................................................................................................................11-17 <br /> Figure 11-9. Uranium Concentrations in Ralston Creek at Downstream Stations SW-ARH and SW-LLHG, <br /> 1990 - Mar 2010 .................................................................................................................11-18 <br /> Figure 14-1. Comparison of TDS and Uranium Concentrations in Ralston Creek, Upstream and <br /> Downstream of Waste Rock Dumps .....................................................................................14-4 <br /> Figure 15-1. Proposed Wetland Area ........................................................................................................15-5 <br /> Figure 15-2. Preliminary Location Considered for Funnel-and-Gate PRB System ..................................15-9 <br /> Figure 15-3. Cross Section N521W Through Schwartz Trend showing Proposed Locations for Bedrock <br /> Monitoring Wells ................................................................................................................15-11 <br /> Figure 17-1. Soil Types in Vicinity of Schwartzwalder Mine .................................................................. 17-4 <br />4109C.100419 Whetstone Associates