My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-04-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
4/22/2010 7:19:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/21/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: 03/14/2010
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amen <br />Earth & Environmental <br />Location This Week <br />tons Coutm)lative Comments <br />E Cresson Clay Processing 2,278 42,676 <br />S Cresson Clay Processing 0 201,199 Processing in area complete. <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 2,278 273,080 <br />2) Low Volume Solution Collection Fill Material (LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D-10 dozer and a skid steer loader were used to process the material. <br /> This Week Cumulative <br />Location Comments <br /> (tons) <br />Dump 4 LVSCF Processing 15,242 210,068 <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft/Stope Remediation <br />Excavation of the collapsed crown pillar and temporary fill was performed at the Underground <br />Working #3012 cleaning out and discovering limits of the working. This was performed using a <br />CAT 345 excavator assisted by a CAT D-9 dozer. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />V) VLF Primary Underdrain <br />No work was performed during the week. <br />VI)VLF Geosynthetics <br />No work was performed on site during the week. <br />VLF Weekly Report WE 03.20.10.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.