My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-04-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
4/21/2010 7:23:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/20/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: 03/21/2010 and 03/28/2010
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ame" <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: April 3, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 3/28/10 through 4/3/10 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 14°F to 42°F (+/-) High: 28°F to 63°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Fill haulage was not performed during night shift Friday (4/2/2010), or during day/night shift <br />Saturday (4/3/2010), due to lack of cut material. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D-8 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem-axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A20+00 (+/-) and <br />A26+00 (+/-), approximately 0 to 200 feet left of centerline; between stations C0+50 (+/-) and <br />C4+00 (+/-), approximately 20 to 100 feet right of centerline; between stations F5+00 (+/-) and <br />F12+50 (+/-), approximately 20 to 175 feet right of centerline; and between stations H0+00 <br />(+/-) and H12+00 (+/-), approximately 0 to 150 feet left of centerline. Slope contouring was <br />performed using various CAT dozers and various CAT excavators. Material generated as the <br />cut progressed was pushed down the slope. <br />VLF Weekly Report WE 04.03.10.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.