Laserfiche WebLink
<br />• <br />EXECUTIVE SUMMARY 1 <br />1.0 INTRODUCTION 3 <br /> 1.1 Terms and Conditions 3 <br /> 1.2 Purpose and Scope of Work 3 <br /> 1.3 Project Description 3 <br />2.0 LAND DISTURBED IN 2009 4 <br />3.0 RECLAMATION ACTIVITIES IN 2008 5 <br /> 3.1 Constructed Wetlands Area and Adjacent Slope 5 <br /> 3.2 Tie Camp Creek Disposal Cell 6 <br />4.0 MONITORING AND ANNUAL REPORTING 7 <br /> 4.1 Slope Movement Vector Analysis 7 <br /> 4.2 Inclinometer Evaluation 8 <br /> 4.3 Pinnacle, Mine Workings Monitoring 9 <br /> 4.3.1 Spring and Seep Monitoring 10 <br /> 4.3.2 Groundwater Levels 11 <br /> 4.3.3 Pinnacle Adit Flow 11 <br /> 4.3.4 Radium and Uranium Concentrations at PP-01 11 <br /> 4.4 Sediment Control Embankment 12 <br /> 4.5 Waste Rock Dumps 13 <br /> 4.6 Water Quality Monitoring 14 <br /> 4.7 Radioactive Materials License 14 <br />5.0 INSPECTIONS 15 <br />6.0 SURETY 16 <br />7.0 MONITORING & RECLAMATION ACTIVITIES PLANNED FOR 2010 17 <br />Table of Contents <br />0