My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-16_REVISION - M1978051 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978051
>
2010-04-16_REVISION - M1978051 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:30 PM
Creation date
4/19/2010 11:16:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978051
IBM Index Class Name
REVISION
Doc Date
4/16/2010
Doc Name
Additional Information- FAX
From
Lincoln County
To
DRMS
Type & Sequence
TR1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fr1 /L <br /> <br />V EDE PIT <br />1978-051 <br />? TECHNICAL REVISION <br />ADDITIONAL .INFORMATION <br />Imported Topsoil Required <br />Permitted Area of the site: 1,000 Lin. Ft. by 435 Lin Ft. <br />-?W; IM MS <br />14-Pa <br />Disturbed Area requiring imported topsoil.: measured April 15, 2010 by Ken <br />Morrison: <br />660 Lin. Ft. by 365 Lin. Ft. <br />240, 900 Sq. Ft. or 5.53 acres. <br />The technical revision calls for the importation of 3 to 4 inches of clean <br />topsoil.. For quantity calculations use the average of 3.5 inches: <br />240.900 sq. ft. X 3.5'/12" = 70,262 cu. ft./ 27 cu. ft/cu. yd. <br />- 2602 cubic yards <br />Line County will import approximately 2600 cubic yards of topsoil. The <br />import of the topsoil will commence when the current stockpiles of <br />sand/gravel and some additional removal of material occurs. The additional <br />removal would be in depth only; there would be no additional area disturbed. <br />Lincoln County projects that the pit will be exhausted of available material <br />in the fall of 2010 or early summer of 201.1. The importation of the topsoil <br />would within two or three months of the last removal of material. <br />Reclamation will start once the proper quantity of topsoil is imported and <br />properly placed. <br />2/2:aeed <br />ST822W-6TL:w0Jd Lo:eo oTo2-9T-Ndu
The URL can be used to link to this page
Your browser does not support the video tag.