Laserfiche WebLink
lower level than the retention pond design. Please advise me on your suggestions on <br />this, as we are open to make changes as needed for safety. <br />Pond No. 2 will be elevated above the highway some, but was to be <br />constructed west of the highwall adjacent to Highway 141 so water would not be <br />behind this section, but to the west of it. The height or depth of his pond again <br />could be changed some to help with safety. We will be a number of years before this <br />pond is built, unless there is some major event or up turn in the economy takes <br />place, so we could make changes to this pond design along the way if it would help <br />safety concerns. Please advise with your ideas. <br />We are fazing a copy of this letter immediately and will follow that with a <br />mailed hard copy, as the fazed copy will have to suffice due to the short notice not <br />allowing enough time to mail a response. <br />Since <br />Leon Moores