My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-16_REPORT - C1982056 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2010-04-16_REPORT - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:14 PM
Creation date
4/16/2010 10:44:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REPORT
Doc Date
4/16/2010
Doc Name
2009 Annual Hydrology Report
From
Twentymile Coal Company
To
DRMS
Annual Report Year
2009
Permit Index Doc Type
Hydrology Report
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is Emergency Discharge Permit COG-850048 <br />In late August 2008, an unanticipated rise in water levels within sealed mine areas resulted in a condition where <br />water was backed-up against the mine seals in two areas of the mine (old WMD and EMD). Due to concerns'of a <br />potential inundation hazard to the safety of the miners, TCC temporarily suspended operations, withdrew all <br />personnel and notified MSHA. The mine was shut down for approximately 10 days. During this period an <br />emergency discharge permit was obtained from CDPHE, and a 12-inch diameter high density polyethylene <br />(HDPE) pipeline was installed from the existing TORT pump in the EMD to a drainage ditch and flume leading to <br />Foidel Creek, east of the intersection of County Road 33, the railroad tracks, and the entrance road for 6MN pad. <br />In addition HDPE piping was also installed from a pump located at the old Fish Creek Ventilation Shaft (FCVS) <br />in the old WMD to the Area # 1 Pit for dewatering. As of the first week in March 2010, there is approximately <br />30.5 feet of freeboard in the old WMD. As a result of the flooding, a water balance study was conducted by TCC <br />in early 2009, and is discussed further under section 3.9. <br />Discharge at 1ORt was initiated in early September 2008. During discharge, downstream water quality samples <br />were collected to verify potential impacts. Samples collected at site 1005 (Trout Creek) downstream of <br />confluences from Fish Creek and Foidel Creek. The secondary stream standard of 250 mg/l for sulfate was of <br />concern. In discussions with CDPHE, they indicated that their database showed no down stream portable water <br />users for Trout Creek, so the standard was not applicable, however TCC was aware that a family (Richard Jones) <br />did utilize an alluvial well for showering, washing dishes and clothes. In 2008, TCC purchased two 2000 gallon <br />storage tanks for the Jones, and had them buried on his property at his direction with the appropriate plumbing <br />hook-ups to his home. TCC is currently paying for clean imported water (i.e. Raindrop, Inc.) to be delivered to <br />their new tanks, so they would discontinue using their alluvial well. <br />Subsequent water quality data from the TORT raw effluent indicated some exceedances for total recoverable iron. <br />In addition it became obvious that the raw effluent would not be able to pass the required quarterly Whole <br />Effluent Toxicity (WET) test. Note that water quality samples collected at site 900, downstream of the TORT and <br />upstream of the confluence with Middle Creek, passed three consecutive WET tests and met iron requirements. <br />Bench tests on the raw effluent were conducted by the analytical laboratory Aqua-Tox of Wheatridge, Colorado. <br />These tests suggested that elevated concentrations of sulfate and ammonia contributed to the WET test failures. <br />Based upon TORT exceedances, TCC discontinued discharge in early 2009, and utilized a new piping system that <br />pumped water from TORT to the area # 1 Pit impoundment. To date, mine water that has overflowed from the Pit <br />(through site 7) to Pond D has meet CDPS permit limitations at Outfall 005A, as well as WET test requirements. <br />This is attributed to the significant resonance time for water passing through both impoundments, allowing for <br />aeration and some mineral constituents to drop out. <br />The emergency discharge permit was allowed to expire in September 2009. Despite the success of mine <br />discharge through the two impoundments, TCC is still considering applying with CDPHE for a permanent CDPS <br />discharge Outfall for TORT (east of the original discharge location). A proposal to create to baffled pond, leading <br />14
The URL can be used to link to this page
Your browser does not support the video tag.