Laserfiche WebLink
TABLE 1 <br />MONTHLY DISTRIBUTIONS OF DEPLETION AND REPLACEMENTS REQUIREMENTS <br />EAST RIGDEN (M79-0971 THREE BELLS PIT (M79-191)KYGER PIT (M99-088) PORT OF ENTRY PIT (M82-182). WEIZEL PIT (M86-050)SHIELDS MINE (MO6-064) <br /> ACCRETIONS & FARM HEADGAT <br /> <br /> <br />EAST RIGDEN <br /> <br />THREE BELLS <br /> <br />PORT OF <br /> <br />SHILEDS <br /> <br />TOTAL MIDDLE <br />DEPLETIONS <br />FROM 8 <br />5 <br />DELIVERY LAGGED <br />ACCRETIONS <br />SUMMER <br />WINTER <br />ESTIMATED <br />ACCRETION <br />MONTHLY REPLACEMENT <br />WATER PROVIDEC <br /> <br />PIT <br />PIT <br />KYGER PIT <br />ENTRY PIT <br />WEIZEL PIT <br />MINE <br />POUDRE . <br />BOX ELDER DITCH F 8,5 BOX ELDE <br />SHARES INTO FROM 8.5 <br />SH RETURN RETURN EVAPORATION CREDITS FROM EXCESS BY THE CITY OF <br /> <br />DEPLETIONS <br />DEPLETIONS <br />DEPLETIONS <br />DEPLETIONS <br />DEPLETIONS <br />DEPLETIONS <br />DEPLETIONS <br />SHARES <br />RECHARGE ARES <br />FR FLOW FLOW LOSSES FROM DEWATERING A OR DEFICIT GREELEY <br /> . OM RECHARGE OBLIGATION OBLIGATION RECHARGE PIT E THREE BE AT THE RIVER LEASE <br /> t 3 4 5 6 8 9 10 <br /> <br />NOVEMBER(09) <br />0.9 <br />3.13 <br />0.31 <br />3.27 <br />12.74 <br />1 <br />53 <br />21 <br />88 <br />18 <br />29 11 12 13 14 15 16 <br />DECEMBER(09) <br />024 <br />1.80 <br />0.16 <br />1.00 <br />11.63 . <br />1.51 . <br />16.54 - <br />. <br />'-13.70 47.76 <br />32 <br />95 1016 -1.38 13.74 0.00 <br /> <br />JANUARY(10) <br />0.13 <br />1.27 <br />0.12 <br />0.58 <br />10.60 <br />1.46 <br />14 <br />16 <br />-11 <br />48 . 8.06 2.07 10.42 0.00 <br /> <br />FEBRUARY(10) <br />0.1 <br />1.18 <br />0.11 <br />0.46 <br />9.47 <br />1.39 . <br />12.71 . <br />-9 <br />71 25.37 <br />21 <br />18 6.75 1.04 5.50 0.00 <br /> <br />MARCH(10) <br />081 <br />226 <br />0.26 <br />2.81 <br />8.60 <br />1.31 <br />16 <br />05 . <br /> <br />-8 <br />76 . 5.71 -4.13 -1.37 1.37 <br />(l 0) <br /> <br />1 <br />0) <br />1.39 <br />3.43 <br />0.38 <br />4.76 <br />8.40 <br />1.24 . <br />19.60 . <br />3 <br />38 <br /> <br />75 <br />00 18.48 5.15 3.10 0.38 0.00 <br />MAY(1 <br />0) <br />MAY(1 <br />1.75 <br />4.44 <br />0.45 <br />5.97 <br />8.72 <br />1.19 <br />22.52 , <br />77.53 . <br />165 <br />00 23.96 <br />48 <br />56 <br />3 1.99 0.21 -1.28 0.88 0.00 <br /> <br />JUNE(10) <br />241 <br />5.72 <br />0.59 <br />8.51 <br />9.34 <br />1.1 <br />5 <br /> <br />27.72 <br /> <br />109 <br />88 . <br /> <br />130 <br />00 . <br /> <br />7 8.82 0.25 2.06 -10.97 <br />10.97 <br /> <br />JULY(10) <br />281 <br />6.61 <br />0.68 <br />9.92 <br />10.46 <br />1.12 <br />31.60 . . <br />149 <br />00 3.57 <br />82 <br />98 31.24 <br />34 0.36 -1.48 12.87 0.00 <br /> <br />AUGUST(10) <br />2.7 <br />6.54 <br />0.66 <br />9.47 <br />11.72 <br />1.10 <br />32.19 . <br />135 <br />00 . <br />91 <br />24 .94 0.41 1.96 17.99 0.00 <br /> <br />SEPTEMBER(10) <br />2.08 <br />5.30 <br />0.52 <br />7.34 <br />12.58 <br />1.09 <br />28.91 = . <br />77 <br />91 . <br />88 <br />96 48.19 0.37 0.93 11.42 0.00 <br />OCTOBER 10 1.44 04 <br />4 0.37 5.09 12.73 1.07 24.74 . <br />25 <br />00 . 50.65 <br />OTAL 16 4.61 59.18 12719 15.16 268.62 426 <br />26 . <br />756 <br />91 6 <br /> . . 29.00 203.84 50.16 2.04 2.93 12.34 <br />(1) Total lagged mining depletions at East Rigden Pd <br />(2) Total lagged mining depletions at the Three Bells Pit <br />(3) Total lagged mining depletions at the Kyger Pit <br />(4) Total lagged mining depletions at Port of Entry Pit <br />(5) Total lagged mining depletions at Wetzel pit <br />(6) Total lagged mining depletions at Shields Mine <br />m Total Remaining Middle Poudre Depletions (3)+(4)+(5).(6)+(7)+(8)+(9) <br />(8) Historic accretions and depletions from 8.5 Box Elder Ditch shares. Amounts include historical return flow obligations for the 8.5 shares. <br />(9) Volume of diversion into the recharge pit on the Three Bells Pit she. <br />(10) lagged accretions from the 8.5 shares at the river from recharge model run in 2008-2009 <br />(11) Summer return flow obligation for the 8.5 shares <br />(12) Non-Irrigation season return flow for the 8.5 shares that will be maintained in their historic pattern by the recharge program <br />(13) Estimated evaporation from the recharge pit <br />(14) Accretion credits from dewatedng at the Three Bells site <br />(15) Monthly excess or deficit at the river <br />(16) Replacement water provided by the City of Greeley lease <br />Greeley 35th Ave, East Rigden,Three Bells Pit, Kyger Pit, Port of Entry Pit and Wetzel Pit, Shields Mine monthly distribution and replacements (09-10)