Laserfiche WebLink
4, Boyd and- Freeman Aug menta ion Station. Greeley agrees to use best . <br />efforts to design, obtain Division of Water Resources approval for, and construct the . ?s <br />Boyd and Freeman Augmentation Station at its expense for use to deliver Augaaentatidii <br />Water commencing in April X009. The Boyd and Freeman Augmei tatiosi Siation'shall =. <br />;' . <br />be owned-by Greeley, is preliminarily proposed to he located oii Creels <br />ypp raerry nordi3 <br />of the Rover Run dog parr and shall be designed and cofistr46ted to, deliver water at a, s- <br />ow h; <br />flow rate 'equal to or greater than Lafarge's pro rata share of the total rate of fl <br />currently decreed to the Boyd and. Freeman Mich and available under the Boyd and <br />Freeman Ditch Water l?.ights. Lafarge agnre to cooperate with Greeley iii obtaining .Fs <br />approvals for the Boyd and Freeman Augmentation Station.. _ <br />5. Neaot p4na for Gravel Pit Storage Facilities. The parties agree to pay' <br />; <br />one-half each of the costs of a study to be performed by Lyman Henn or another <br />mutually acceptable consultant to evaluate the feasibility and east ofconstructingand - <br />operating !used water storage facilities and associated structures frora gravel pits Xorated <br />or to be located on Lafarge's 35th Avenue Pit site, or oil other'riba'- b sited in which <br />Lafarge has obtained or may in the fitture obtain, a gravel mining lease, including without <br />limitation Greeley's F Street Reservoir' site. The' <br />precise scope of work of the study shxli <br />be agreed upon by the parties in advance. The parties estimate that such study will take; ry = <br />approximately four months to complete: Following the completion, of such study; the ' <br />parties will discuss the study and apossible second transaction involving Greeley's <br />acquisition of such facilities or the right to construct and operate rhem i in exchange for = <br />Grz eeley's long-term lease of additional. Augmentation Water to .Lafarge or other : ' . <br />Go?asidearatiou. Gxeele shall have the,exclusiv'e right to negotiate with L e <br />coneeming sueh.acquisition' for 12 months following the par l receipt of such study...: <br />6. Lafkee .liwior Water Storage 'N. Lafarge agrees to use best efforts n ; <br />(as further limited herein} to obtain" a decree ia, the application for junior conditional <br />: water storage rights for 35th Avenue Reservoir currently pending in Case No. 98CW47 <br />' i . <br />Water Division No. 1, with decreed uses that include a) the replacement of evaporative <br />losses from all sand and gravel mining sites currently owned by Lafarge, from other. sand <br />and gravel mining sites located or to be located between the headgate of Greeley Canal; <br />No. 3 and the Ogilvy Cain i in which Lafarge may have or assume any responsibility four <br />xeplacenrieiat of such losses, or. from the F Street Reservoir, 8th Street Reservoir, and ' <br />Flatiron/Greeley West Pit sites, and b) the replacement of return flow obligations decreed <br />or to be decreed as conditions of the approval of any change of water right that mattes <br />such right legally available for the replacement of any such losses, including changed r, <br />water rights originally decreed to Greeley Canal No. 3 and associated with shares of r :. <br />stock la the Greeley Irrigation Company. Greeley agrees not to oppose the eatty of a r., <br />decree in such application that contains these terms, and to discuss with Lafarge possible <br />strategies to obtain such a decree. If Lafarge obtains such a decree and the parties <br />successfully negotiate a subsequent transaction involving Greeley's:acquisition of the - <br />iiggt to water storage facilities described in the preceding paragraph, Lafarge and Gxreelay <br />agrees to negotiate in good faith, as part of such transaction, Greeley,s acquisition of a <br />:.. pro rata interest in the decreed junior conditional rights upon payment by Greeley of su4 <br />I <br />i