Laserfiche WebLink
<br />Demolition Costs Associated with New E-Train Modification Project in Support of Phase 5 of the Valley Leach Facility (TR 58) <br />Length Width Height Volume (cu ft) Cost per Total Cost 2Reference Dwg. <br />Name of Structure Location Type of Structure (feet) (feet) (feet) cu ft ($) <br />ADR Building Expansion ADR Area - Expanded Steel and <br />Area for New (2010) E- Existing Building ?oncrete <br />Train <br />MCC & Fume Scrubber ADR Area - Expanded Steel and <br />Room Existing Building Concrete <br />Enrichment Pump <br />Station <br />Phase 5 - Preg Pump <br />Electrical MCC Bldg. <br />Phase 5 - Preg & <br />Enrichment Pumping <br />Electrical MCC Bldg. <br />Phase 5 - Preg & <br />Enrichment Pumping <br />LVSC Pump Control <br />Shed <br /> <br /> <br />East of Existing ADR Steel and <br /> Concrete <br />/ <br /> <br />East of Existing ADR Steel and <br /> Concrete <br /> <br />East of Existing ADR Steel and <br /> Concrete <br /> <br />East of Existing ADR Steel and <br /> Concrete <br />State Administrative Costs in Percent <br />142 42 <br />37 16 <br />60 30 <br />22 22 <br />42 22 <br />20 10 <br />53 <br />16 <br />38 <br />17 <br />17 <br />12 <br />316,092 $ 0.26 $ <br />W-X <br />9,472 $ 0.26 $ <br />68,400 $ 0.26 $ <br />8,228 $ 0.26 $ <br />82,184 ?51-541-01 & <br />51-541-02 <br />2,463 51-541-01 & <br />51-541-02 <br />17,784 51-541-11 <br />2,139 51-546-01 <br />15,708 $ 0.2 $ 4,084 51-541-12 <br />2,400 $ 0.2 $ 624 51-546-02 <br />Total Direct Demolition Costs = 109,278 <br />22.5 $ 24,588 <br />Grand Total Costs = $ 133,866 <br />'R.S. Means Heavy Construction Cost Data for 2010 page 33. <br />2Note: Building dimensions are from FLSmidth / Centry Drawings provided by M. Jah <br />N tVUzVA-" raus (February 2010) rr L,. nn I '' 44 <br />MDE (3-1-10 Rev 3-18-10