My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-07_PERMIT FILE - M2009094
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009094
>
2010-04-07_PERMIT FILE - M2009094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:32 PM
Creation date
4/14/2010 1:52:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009094
IBM Index Class Name
PERMIT FILE
Doc Date
4/7/2010
Doc Name
Cost summary form
From
DRMS
To
Alamosa Pit
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :New 112c aaplication <br />Task description : Smooth grade pit floor <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200,1 <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 310 <br />Shiftbasis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br />::::: ::.::................................................................................... <br /> <br />MATERIAL <br />QU ANTITIES ........................... .................... <br />.. <br />................................................................................ <br />Initial Swell Loose <br />volume : 4,033 volume <br /> <br />CCY <br />factor : 1.250 <br />5,041 LCY <br />Source of estimated volume :5 ac floorx 6 in depth <br />Source of estimated swell factor :program <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.60 (fnd-so <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 lbs/LCY Net correction : 0.30 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 258.41 LCY/hr <br /> Adjusted fleet production : 258.41 LCY/hr <br /> <br /> <br />JOB TIME AND COST ;.. <br />Fleet size : 1 Dozer(s) Total job time : 19.51 Hours <br />Unit cost : $0.630 /LCY Total job cost : $3,178 <br />
The URL can be used to link to this page
Your browser does not support the video tag.