Laserfiche WebLink
<br /> <br />ADJUSTED COSTS <br /> <br />Ownership Costs <br /> <br />Depreciation CFC Overhead <br />...:.....:.: <br />.:... ,..:::.: <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $18.35 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $18.35 NA NA $7.89 $14.36 $8.77 $13.86 NA NA NA NA <br />-Attachment no. 2: NA NA NA $1.27 $1.35 $2.33 $1.36 NA NA NA NA <br />Annual usage : $27.68 $13.05 $12.81 NA NA NA NA NA NA NA NA <br />Double shifts : $20.76 $6.52 $6.40 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.46 $4.35 $4.26 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $4.61 NA $5.12 NA NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.74 NA $1.36 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $24.99 $5.41 $0.00 $2.01 <br />Attachment no 2 NA NA NA NA NA NA NA $0.00 $0.35 $0.00 $1.13 <br /> <br />ADJUSTED COST SUBTOTALS <br /> <br /> <br /> <br />epreciation <br />Ownership Costs <br /> <br /> <br />CFC <br /> <br /> <br /> <br />verhead <br /> <br /> <br />verhaul <br />Labor Parts . :. <br /> <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS : <br />Single shifts : $27.68 $13.05 $12.81 $4.61 $14.36 $5.12 $13.86 $24.99 $5.41 $0.00 $2.01 <br />Double shifts : $20.76 $6.52 $6.40 Ripper : <br />Triple shifts : $18.46 $4.35 $4.26 $0.74 $1.35 $1.36 $1.36 $0.00 $0.35 $0.00 $1.13 <br /> <br /> <br />HOURLY OPERATOR WAGES <br /> <br />Base <br /> <br />Fringe <br /> <br />F.I.C.A. .. <br /> <br />Unempl. _ <br /> <br />Wk.Comp. <br /> <br />Total <br />»; :...:. <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $53.54 $70.36 $6.29 $38.54 $168.72 <br />Double shifts : $33.69 $70.36 $6.29 $38.69 $149.02 <br />Triple shifts:, $27.07 $70.36 $6.29 $38.79 $142.51 <br />...... ........... <br />SPECIFICATIONS <br />DSR Series 11- 8SU <br />RIPPER: <br /> Transmission <br />Type Weight <br />(UST) Length <br />(ft.) Width <br />(ft.) Height <br />(ft.) Fuel <br />type Horsepower <br />(fhp) <br /> NA 41.8 22.7 8.7 11.5 diesel 310 <br /> <br />Weight Capacity Width Height ravel speeds (mph) : <br />Gear: 1st <br /> (UST) (cy) (ft.) (ft.) Forward : 2.2 <br /> 5.4 11.4 12.9 5.5 Reverse : 2.9 <br /> <br />Type Weight <br />(UST) No. of <br />shanks Shank <br />spacing (ft) Beam <br />width (ft) <br />Parallelogram 5.4 3 16 7.1 <br />Total machine shipping weight : 52.5 US tons <br />2nd <br />3.9 <br />5.0 <br />Max. rip <br />iepth (ft) <br />2.6 <br />3rd <br />6.7 <br />8.6