My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-07_REVISION - M2001069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001069
>
2010-04-07_REVISION - M2001069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:41 PM
Creation date
4/14/2010 1:52:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001069
IBM Index Class Name
REVISION
Doc Date
4/7/2010
Doc Name
Cost summary form
From
DRMS
To
Del Norte West Valley Pit
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $19.26 NA NA NA NA NA NA NA NA NA NA <br />Economic life Scraper and ROPS : $19.26 NA NA $7.89 $21.28 $12.27 $19.16 NA NA NA NA <br />-Attachment no. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />Annual usage : $33.34 $19.39 $22.16 NA NA NA NA NA NA NA NA <br />Double shifts : $25.00 $9.69 $11.08 NA NA NA NA NA NA NA NA <br />Triple shifts : $22.24 $6.46 $7.38 NA NA NA NA NA NA NA NA <br />Mechanic labor -Scraper and ROPS : NA NA NA $4.61 NA $7.16 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />Fuel/lube -Scraper and ROPS : NA NA NA NA NA NA NA $30.15 $7.32 $4.80 $1.64 <br />-Attachment no. 2: NA NA NA NA NA NA NA NA NA NA NA <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Scraper, ROPS and Attachment no. 2: Scraper and ROPS : <br />Single shifts : $33.34 $19.39 $22.16 $4.61 $21.28 $7.16 $19.16 $30.15 $7.32 $4.80 $1.64 <br />Double shifts : $25.00 $9.69 $11.08 ttachment No. 2 : <br />Triple shifts : $22.24 $6.46 $7.38 NA NA NA NA NA NA NA NA <br /> <br />HOURLY OPERATOR WAGES <br />Base <br />Fringe <br />F.I.C.A. <br />Unempl. <br />Wk.Comp. <br />Total .. . <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Scraper operator (<40cy $17.62 $3.16 $1.35 $1.09 $1.76 $24.98 $0.00 Two shift per day average : $0.15 <br /> <br />Scraper operator (40+cy <br />$17.62 <br />$3.16 <br />$1.35 <br />$1.09 <br />$1.76 <br />$24.98 <br />Sw <br />jn <br />$0.30 <br />Three s <br />hift per day average : <br /> <br />$0.25 <br />Mechani $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 i $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $74.88 $96.12 NA $24.98 $195.99 <br />Double shifts : $45.78 $96.12 NA $25.13 $167.03 <br />Triple shifts : $36.07 $96.12 NA $25.23 $157.42 <br />EQUIPMENT PERFORMANCE DATA <br />Machine description : Cat 623G Type of scraper : Single engine elevating <br /> Struck Heaped Average Minimum <br />Operating weight <br />(UST) Operating weight <br />(MT) GVW <br />(Ibs) Rated <br />payload (UST) Operating <br />length (ft.) Operating <br />width (ft.) Shipping <br />width (ft.) Operating <br />height (ft.) capacity <br />(cy) capacity <br />(cy) capacity <br />(cy) turning <br />circle (ft.) <br />40.92 37.11 136,840 27.50 43.33 11.67 11.67 12.08 18.00 23.00 20.50 35.7 <br /> <br />RAVEL SPEEDS (mph) Top speed Horsepower Fuel <br />Transmission gear : 1 st 2nd 3rd 4th 5th 6th 7th loaded (mph) (I type <br />forward : NA NA NA NA NA NA NA <br />reverse : NA NA NA NA NA NA NA 32 365 Diesel
The URL can be used to link to this page
Your browser does not support the video tag.