Laserfiche WebLink
3) Automobile Liability Insurance covering any auto (including owned, hire and non -owned autos) with a <br />minimum limit as follows: $1,000,000 each accident combined single limit. <br />The Certificates of Insurance and insurance policies required above shall be subject to the following stipulations: <br />B. The State of Colorado shall be named as additional insured on the Commercial General Liability and <br />Automobile Liability Insurance policies (leases and construction contracts will require the additional insured <br />coverage for completed operations on endorsements CG 2010 11/85, CG 2037 or equivalent). Coverage <br />required of the contract will be primary over any insurance or self - insurance program carried by the State of <br />Colorado. <br />C. The Insurance shall include provisions preventing cancellation or non - renewal without at least 45 days prior <br />notice to the State by certified mail. <br />D. The contractor will require all insurance policies in any way related to the contract and secured and maintained <br />by the contractor to include clauses stating that each carrier will waive all rights of recovery, under subrogation <br />or otherwise, against the State of Colorado, its agencies, institutions, organizations, officers, agents, employees <br />and volunteers. <br />E. All policies evidencing the insurance coverages required hereunder shall be issued by insurance companies <br />satisfactory to the State. <br />F. The contractor shall provide certificates showing insurance coverage required by this contract to the State <br />within ten days of the notice of award. No later than 15 days prior to the expiration date of any such coverage, <br />the contractor shall deliver the State certificates of insurance evidencing renewals thereof. At anytime during <br />the term of this contract, the State may request in writing, and the contractor shall thereupon within 10 days <br />supply to the State, evidence satisfactory to the State of compliance with the provisions of this section. <br />Bidders are advised to consult with their insurance carrier concerning these requirements. Submit a bid only if <br />you are prepared to complete these requirements. <br />5. WORK SCHEDULE <br />After a Purchase Order has been issued, the PROJECT MANAGER will notify the Contractor. Under no circumstances <br />shall the CONTRACTOR begin work before a P.O. is issued. If the Bid Solicitation Memorandum specifies project dates <br />or a certain project schedule, the successful bidder shall perform the work during the specified time period. DRMS <br />reserves the right to cancel the Purchase Order if the Contractor fails to begin the work as scheduled. <br />6. ACCIDENT PREVENTION AND SAFETY MEASURES <br />The Contractor shall comply with applicable provisions of OSHA Part 1926, Construction Standards and Interpretations, in <br />effect on the date of the Bid Opening. The Contractor shall continuously maintain, at his expense, adequate protection of <br />the work and the Principle Representative's property, and shall take all practicable precautions in the interest of safety. <br />Any shafts which were fenced prior to construction activities shall be protected by a temporary fence during non - working <br />hours, without relieving the Contractor of its legal or contractual duties to take safety precautions. Other openings may be <br />designated by the Project Manager as requiring fencing due to proximity of houses or visitation by tourists. <br />Work may involve activities around unprotected hazardous mine shafts, stopes, adits and other openings which may be <br />open to the surface or hidden from view by trash, debris, vegetation, or thin and unstable layers of surficial materials or <br />rock. The Contractor shall be responsible for thoroughly investigating the site conditions and scheduling and directing his <br />equipment, equipment operations, personnel and safety procedures to prevent accidents and injuries. Failure to comply <br />will be cause for immediate suspension of the work. <br />7. PLANS AND WORKING DRAWINGS <br />The drawings if any, included with this contract are complete and adequate for construction. While every effort has been <br />made to have the plans and drawings free of errors and ambiguities, any such errors or ambiguities must be brought to <br />the Project Manager's attention immediately. <br />8. CORRESPONDENCE FROM THE CONTRACTOR <br />All correspondence from the Contractor to the State shall be submitted to: <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, Colorado 80203 <br />(303) 866 -3567 <br />Fax (303) 832 -8106 <br />9. MATERIALS <br />Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, <br />power, transportation and other facilities necessary for the execution and completion of the work. <br />Unless otherwise specified, all materials shall be new and both workmanship and materials, shall be of good and uniform <br />quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. <br />As of 01/08/09 <br />