My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-14_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2010-04-14_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:04:01 PM
Creation date
4/14/2010 12:25:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
4/14/2010
Doc Name
Adequacy Review
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR143
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />April 14, 2010 <br />Mr. Scott Wanstedt <br />Environmental Engineer <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />RE: Deserado Mine, C1981-018, MR143, adequacy review <br />Dear Mr. Wanstedt: <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />James B. Martin <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has reviewed Blue Mountain Energy's (BME) application for a minor revision, MR143. Minor <br />Revision No. 143 provided designs and modeling of proposed changes to the Pond DR-1 riser, modifications <br />to a federal coal lease, and changes to the location of a water pump and waterline route located at the Raw <br />Water Lagoon. <br />The Division's estimate of reclamation costs associated with the proposed changes was $3, 237.00. A copy of <br />the Division's estimate is attached to this letter. <br />The Division is in agreement with the design modeling BME provided for the change to the DP-1 riser design. <br />The Division has one item that needs additional information: <br />1. In accordance with Rule 2.05.3(4)(a)(ii)(c), please describe in the permit text how the gate on the <br />weep hole will be operated, under what conditions will it be closed, if any, and a commitment to <br />sample all manual discharges in accordance with the approved CDPS permit. The existing page IV-39 <br />in the PAP would be a logical place to add this text. <br />The proposed decision date for MR143 is April 15, 2010. Please provide this information as soon a possible <br />in order to meet the regulatory permitting timeframe. <br />Bt?viromrl.Vtal Protection Specialist II <br />(30 -3567 ext. 8107 <br />Attachment : MR143 RCE <br />Office of Office of <br />Mined Land Reclamation Denver • Grand )unction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.