My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981015 (11)
>
Day Forward
>
General Documents
>
Coal
>
C1981015
>
_GENERAL DOCUMENTS - C1981015 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 5:59:00 AM
Creation date
4/14/2010 11:37:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Name
PKA-9-1149 Finalized Bid Package
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIME OF COMPLETION <br /> The time of completion allowed for the project is 21 calendar days after receipt of the Notice to <br /> Proceed. This includes ten (10) days mobilization time. <br /> LIQUIDATED DAMAGES <br /> The liquidated damages for this project will be $400.00 per day. Please see General Conditions, <br /> Article 39. <br /> NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> A Notice of Award will be sent to the apparent low bidder within four (4) days of the bid opening. <br /> The contract signing date and time will be set for fourteen (14) days after the bid opening. The <br /> Division of Reclamation, Mining and Safety must receive the following: <br /> (a) Executed Agreement; <br /> (b) Fully-executed Performance and Payment Bonds, accompanied by <br /> appropriate Power of Attorney, effectively dated; <br /> (c) Certificates of Insurance showing proof of required coverage and <br /> Additional Insured Endorsement; <br /> (d) Project schedule; <br /> (e) AML Contractor Ownership and Control Form; <br /> (f) Minority(MBE)/women (WBE) Business Participation form; <br /> (g) Three-Way Agreement for Reclamation Activities, if required by the <br /> Special Conditions; <br /> (h) A list of all subcontractors to be used on the project, the work tasks and <br /> dollar value to be subcontracted to each, and <br /> (1) Completed W-9 forms, if required (for contractors new to the State). <br /> Please consult Articles 2-7 of the General Conditions. <br /> If the above documents are not submitted properly by the contract signing date, the Division of <br /> Reclamation, Mining and Safety may elect to award the contract to the! next lowest bidder. <br /> Bidders are advised to keep close contact with CDRMS during this period. <br /> THREE-WAY AGREEMENT <br /> A three way"Agreement for Reclamation Activities" is not required for this job. Please see <br /> Article 4 of the General Conditions for the applicable insurance requirements. <br /> CONDITIONS AFFECTING THE WORK <br /> In addition to examining the drawings and specifications, completion schedule, and other <br /> instructions, bidders shall visit the site and take such other steps as may be reasonably <br /> necessary to ascertain the nature and location of the work, including average climatic conditions <br /> and the general and local conditions which can affect the work or the cost thereof. Failure to do <br /> so will not relieve bidders from responsibility for estimating properly the difficulty or cost of <br /> successfully performing the work. <br /> PROJECT FUNDING <br /> This project is funded by the forfeiture bond money and a civil penalty grant administered by the <br /> United States Office of Surface Mining. <br /> AMERICANS WITH DISABILITIES ACT <br /> - 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.