PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br /> and ensure that each work item is completed and constructed to design specifications. The <br /> PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.)on <br /> weekdays. Inspections will not be scheduled on weekend days or holidays without prior approval of <br /> the PROJECT MANAGER. It is the Contractor's responsibility to schedule inspections with the <br /> Project Manager so as not to delay the work. The following items muss:be observed and approved <br /> by the PROJECT MANAGER before proceeding with additional work: <br /> Backfill Closure- The riprap placed in backfilled openings must be inspected prior to <br /> placement of common fill. <br /> Bulkhead Seal Closures- The closure must be inspected prior'to constructing the final one <br /> foot(1')of the bulkhead and placement of the concrete footer. <br /> Corrugated Steel Adit Closures- Placement of the culvert must be inspected before <br /> backfilling <br /> Adit Grates/Bat Grates- Installation and placement of rebar anchors and concrete footer <br /> must be inspected prior to installing grate. <br /> Monolithic Plug- Placement of rip rap and installation of concrete must be inspected <br /> ADDITIONAL BID ITEMS <br /> There are included on the Bid Schedule, several additional bid items. These bid items are not <br /> guaranteed, and will be used only in the event that conditions change on site, and only after <br /> approved by the PROJECT MANAGER. The additional bid items for this project include: <br /> 1. Safeguard additional features listed on the Bid Schedule, if required. Land owner consent <br /> has not yet been finalized for these features. It is anticipated that consent will be received <br /> before project work begins. <br /> 2. Provide and install 20 cubic yards of riprap from an off-site source in listed mine openings or <br /> nearby mine openings, per specs, if required. <br /> 3. Provide and install 10 cubic yards of concrete from an off-site source, per specs, if required. <br /> 4. Provide and install 10 square feet of steel grating, per specs, if required. <br /> - 11 - <br />