My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981015 (9)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981015
>
_GENERAL DOCUMENTS - C1981015 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 6:13:59 AM
Creation date
4/14/2010 11:37:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Name
PKA-9-1149 Bid Package with Revisions
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be provided to Project Manager prior to application of mulch. <br /> The mulch will be evenly distributed over the ground surface. Surface roughening will occur <br /> simultaneously with distribution of the weed free mulch in order to prevent loss of the mulch due <br /> to wind. <br /> - Roughening, or scarification, of the surface using a track excavator bucket to create numerous <br /> gouges in the ground will follow mulch application. The excavator will pull the ground surface <br /> and mulch toward the machine in a manner that creates pockets twelve inches(12")deep, by <br /> the excavator bucket width by approximately eighteen inches(18")long. These gouges must be <br /> sufficiently close so that no more than eighteen inches(18")exists between the crest of one <br /> gouge and the crest of an adjacent gouge, in any direction, both vertical and horizontal. This <br /> spacing will result in a severely disrupted surface at the mine entry areas and the access road. <br /> Revegetation efforts will occur on approximately one(1)acre,which includes all areas disturbed <br /> during this project. <br /> Measurement and Payment <br /> Measurement and payment for this Task will be as per Revegetation Specification 20.0 of the <br /> General Bid Specifications, 2006. The price bid shall include all costs for labor, materials, <br /> equipment and all other items necessary for revegetation as described in these specifications. <br /> Payment for this task will be made only for the unit price shown under Item 6 of the Bid <br /> Schedule. Payment shall be as this task is completed and approved by the PROJECT <br /> MANAGER. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br /> and ensure that each work item is completed and constructed to design specifications. The <br /> PROJECT MANAGER will be available during regular business hours(8:00 A.M.to 5:00 P.M.)on <br /> weekdays. Inspections will not be scheduled on weekend days or holidays without prior approval of <br /> the PROJECT MANAGER. It is the Contractor's responsibility to schedule inspections with the <br /> Project Manager so as not to delay the work. The following items must be observed and approved <br /> by the PROJECT MANAGER before proceeding with additional work: <br /> The extent of the exposure of the portal hole prior to backfill, compaction and rock <br /> placement. <br /> Polyurethane foam installation, if required. NDf 9WK HIV) <br /> )r Ot Puf <br /> All Equipment Rental Hours. U saj <br /> Initial installation of each check dam type <br /> ADDITIONAL BID ITEMS <br /> There are included on the Bid Schedule, several additional bid items. These bid items are not <br /> guaranteed, and will be used only in the event that conditions change on site, and only after <br /> approved by the PROJECT MANAGER. The additional bid items for this project include: <br /> 1. Equipment Rental-Excavator,CAT 320BL or equivalent sized w/minimum 20'reach,turbo <br /> charged with operator. <br /> - 11 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.