Laserfiche WebLink
PROJECT WORK DESCRIPTION <br />Task 1 <br />Mobilize and Demobilize Crew and Equipment <br />Measurement and Payment <br />Payment for Task 1 shall be reflected in a lump sum bid price under Item 1 on the Invitation and <br />Bid sheet. Payment shall include all the CONTRACTORS expenses for mobilization of <br />equipment to the site, transportation of the equipment within the Project Area, employee time, <br />labor and materials necessary to accomplish the requirements of this Task, compliance with the <br />conditions and requirements described in this Task description, and final clean up of the work <br />place. <br />If the price bid for mobilization and demobilization is greater than 15 percent (15 %) of the total <br />contract price, invoices supporting the mobilization costs will be required before payment is <br />approved. <br />Payment shall be made as described in Specification 1.0, Mobilization / Demobilization of the <br />General Bid Specifications, Colorado Inactive Mine Reclamation Program, 2006. <br />Task 2 <br />Sediment Pond Maintenance: <br />The sediment pond was constructed within the margins of the ephemeral stream which drains <br />through the mine site. The sediment pond is in need of repair in order allow flood waters to <br />safely pass the existing embankment. <br />The 30" Corrugated Metal Pipe (CMP) riser located in the sediment pond must be cut and <br />removed at the base. The 30" CMP pipe and associated items will be disposed of in an <br />approved landfill or salvaged by the CONTRACTOR. The underground portion of the 30" pipe <br />will be plugged with concrete to a length of 4 feet. The concrete shall consist of Type II Portland <br />Cement, conforming to ASTM C 150, unless otherwise approved by the PROJECT MANAGER. <br />The existing emergency spillway on the west side of the pond will be lowered 2 feet and lined <br />with rip -rap obtained on site. The rock will be collected by the CONTRACTOR at a location <br />specified by the PROJECT MANAGER. The channel will remain trapezoidal in shape with <br />2.5H:1 V side slopes. The spillway dimensions are approximately 50 feet long by 8 feet wide <br />(bottom width). The spillway will need to be lined with rip -rap for a length of 75 feet starting from <br />the inside of the channel and down the spillway where it enters the existing channel marked by <br />the PROJECT MANAGER. Rip rap, available on site, will consist of 12" to 18" diameter rock. <br />Placement will be such that voids will be eliminated with rock contacting rock. The rock will be <br />keyed in place at the beginning of the spillway to a depth of 3 feet and keys constructed on 20 <br />foot centers with the last key at the end of the spillway. Side slope rip rap will extend up the <br />sides of the constructed channel to a minimum 4 feet height above the channel base. <br />Measurement and Payment <br />There will be no measurement for payment of Task 2, Sediment Pond Maintenance. Payment <br />for this Task will be reflected in a lump sum bid under Item 2 on the Bid Schedule. This lump <br />sum bid will cover all costs for excavating, hauling, placing and rip -rap lining as described in <br />these specifications. <br />5 <br />