Laserfiche WebLink
DEC-22-2005 10:49AM CENTURY 21 COLE & COMPANY REALTY NO.174 P. 2 <br />Cole & Company <br />Builders, LLC <br />Dec, 22, 2005 <br />Dear Paul, <br />We will do the following work for you per the conversation that you had with Jim Kirk <br />on Tuesday Dec. 20. The work will proceed as follows: <br />We will pull the existing headgate; the opening will be grated, welded, and sealed with <br />non - shrink grout. We will cut a "V" notch into the standpipe with, the base 36 inches <br />from the top. Then we will excavate a spillway to be 12 inches higher than the top of the <br />"V" notch and place a rock at the base of the spillway. <br />Equipment: CAT 315L Excavator with Thumb and Welding Truck <br />Mobilization/Demobilization: $900.00 <br />Materials (Grating & non - shrink grout) $100.00 <br />Machine Time (5 hours): $675.00 <br />Labor: $715,00 <br />overhead/Profit: $404.00 <br />Total Budget: $2,794.00 <br />Work Completion Time: 3 -5 Days <br />If you have any questions please give me a call. <br />Sin e1y, <br />Samantha Rutherford <br />Assistant to the Managing Member <br />Cole & Company Builders, LLC <br />235 N. 7th Street • Grand Junction, Colorado 81501 • Business (870) 2443.7711 a FAX (1170) 248.4605 .1- 800. 269.1366 <br />