Laserfiche WebLink
DEC.21.2005 4:01PM CENTURY 21 COLE & COMPANY REALTY NO.168 P. 2 <br />Cole & Company <br />Builders, LLC <br />Dec. 21, 2005 <br />Dear Paul, <br />We will do the following work for you per follows <br />that you had with Jim Kirk <br />on Tuesday Dec. 20. The work will proceed <br />We '11 ull the existin he ��i e �� dpipe with the b e an <br />36 itaches from the top. The notch will be c l s pillway to 2 an inches higher sealee th <br />with non - shrink grout. Then we will excav p <br />-ton of the "V" notch and place a rock at the base of the spillway. <br />Equipment: CAT 3 1 5L Excavator with Thumb and Welding Truck <br />Mobilization/Demobilization: $900.00 <br />Materials (Grating & non shrink grout) $100.00 <br />Machine Time (5 hours): $675.00 <br />Labor: $715.00 <br />overhead/Profit: $404.00 <br />Total Budget: $2,794.00 <br />Work Completion Time: 3 -5 Days <br />If you have any questions please give me a call. <br />S' erely, MZ1 6 <br />Samantha Rutherford <br />Assistant to the Managing Member <br />Cole & Company Builders, LLC <br />235 N. 7th Street *Grand Junction, Colorado 81501 -Business (970) 243 -7711 * FAX (970) 248-46050 j*e00-289 <br />