Laserfiche WebLink
DEC 22 2005 10:49AM CENTURY 21 CULL & CUMNANY KLALIY <br />Cole & Company <br />Builders, LLC <br />Dec. 22, 2005 <br />Dear Paul, <br />We will do the following work for you per the conversation that you had with Jim Kirk <br />on Tuesday Dec. 20. The work will proceed as follows: <br />We will pull the existing headgate; the opening will be grated, welded, and sealed with <br />non- shrink grout. We will cut a "V" notch into the standpipe with the base 36 inches <br />from the top. 11ten we will excavate a spillway to be 12 inches hi @;her than the top of the <br />'V' notch and place a rods at the base of the spillway. <br />Equipment: CAT 315L Excavator with Thumb and Welding Truck <br />Mobilization/Demobilization: $900.00 <br />Materials (Grating & non - shrink grout) $100.00 <br />Machine Time (5 hours): $675.00 <br />Labor: $715,00 <br />Overhead/Profit: $404.00 <br />Total Budget: $2,794.00 <br />Work Completion Time: 3 -5 Days <br />if you have any questions please give me a call. <br />Sin erely, <br />Samantha Rutherford <br />Assistant to the Managing Member <br />Cole & Company Builders, LLC <br />235 N. 7th Street • Grand Junction, Colorado 81501 • Business (870) 243.7711 *FAX (G70)248-4605 91-800-269-1366 <br />