Laserfiche WebLink
. Fruita Maintenance Project <br /> Bid Schedule <br /> PKA-6-1008 <br /> Description Unit Unit Rate Total <br /> 78 fhp Dozer w/PAT, ripper, 20 Hours $_/hr. $ <br /> operator, and additional machine <br /> for assist <br /> Revegetation including seeding, 1 Job N/A $ <br /> mulching, crimping <br /> Culvert/Ditch work <br /> A 1 Job N/A $ <br /> B 1 Job N/A $ <br /> C 1 Job N/A $ <br /> Grand Total $ <br /> Contractor Date <br /> Signature Phone <br /> Address <br /> Tax ID # <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />