Laserfiche WebLink
K&P PROPERTY DESIGN <br /> 236 South 3rd#219 <br /> Montrose CO, 81401 <br /> (970)249.2638 or (970) 275.0390 <br /> Fax : (970)249.7828 <br /> PROJECT SCHEDULE <br /> FRUITA MINE MAINTENANCE <br /> (PKA-9-1149) <br /> Dates are pending on the notice to proceed. <br /> Days I <br /> Perform mobilization to the work site <br /> Days 2-4 <br /> Portal repair, portal bench check dams <br /> Days 5 <br /> Condition soil on the access to portal for seeding, access road <br /> rock check dams as needed. <br /> Days 6-8 <br /> Emergency spill way, pond structure removal and soil condition- <br /> ing for seeding. <br /> Days 9-15 <br /> Channel repair and construction, fill out slope check dams, soil <br /> conditioning <br /> Days 16 <br /> Seeding, mulching, fertilize and demobilization. <br />