My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-17_GENERAL DOCUMENTS - C1981015 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981015
>
2008-11-17_GENERAL DOCUMENTS - C1981015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:58 PM
Creation date
4/14/2010 10:55:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Date
11/17/2008
Doc Name
PKA-9-1149 Documented Quote Project Bid
From
DRMS
To
Interested Contractors
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Roughening, or scarification, of the surface using a track excavator bucket to create numerous <br />gouges in the ground will follow mulch application. The excavator will pull the ground surface <br />and mulch toward the machine in a manner that creates pockets twelve inches (12 ") deep, by <br />the excavator bucket width by approximately eighteen inches (18 ") long. These gouges must be <br />sufficiently close so that no more than eighteen inches (18 ") exists between the crest of one <br />gouge and the crest of an adjacent gouge, in any direction, both vertical and horizontal. This <br />spacing will result in a severely disrupted surface at the mine entry areas and the access road. <br />Revegetation efforts will occur on approximately one (1) acre, which includes all areas disturbed <br />during this project. <br />Measurement and Payment <br />Measurement and payment for this Task will be as per Revegetation Specification 20.0 of the <br />General Bid Specifications, 2006. The price bid shall include all costs for labor, materials, <br />equipment and all other items necessary for revegetation as described in these specifications. <br />Payment for this task will be made only for the unit price shown under Item 6 of the Bid <br />Schedule. Payment shall be as this task is completed and approved by the PROJECT <br />MANAGER. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br />and ensure that each work item is completed and constructed to design specifications. The <br />PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) on <br />weekdays. Inspections will not be scheduled on weekend days or holidays without prior approval of <br />the PROJECT MANAGER. It is the Contractor's responsibility to schedule inspections with the <br />Project Manager so as not to delay the work. The following items must be observed and approved <br />by the PROJECT MANAGER before proceeding with additional work: <br />The extent of the exposure of the portal hole prior to backfill, compaction and rock <br />placement. <br />Polyurethane foam installation, if required. <br />All Equipment Rental Hours. <br />Initial installation of each check dam type <br />ADDITIONAL BID ITEMS <br />There are included on the Bid Schedule, several additional bid items. These bid items are not <br />guaranteed, and will be used only in the event that conditions change on site, and only after <br />approved by the PROJECT MANAGER. The additional bid items for this project include: <br />7. Equipment Rental- Excavator, CAT 320BL or equivalent sized w/ minimum 20' reach, turbo <br />charged with operator. <br />8. Provide and install 10 cubic yards of riprap from on site source, per specs, if required. <br />9. Install additional Access Road /Fill Outslope Check Dams per specs if required. <br />10. Install additional Bench Check Dams per specs if required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.