Laserfiche WebLink
The Certificates of Insurance and insurance policies required above shall be subject to the following stipulations: <br />B. The State of Colorado shall be named as additional insured on the Commercial General Liability and Automobile Liability <br />Insurance policies (leases and construction contracts will require the additional insured coverage for completed operations <br />on endorsements CG 2010 11/85, CG 2037 or equivalent). Coverage required of the contract will be primary over any <br />insurance or self - insurance program carried by the State of Colorado. <br />C. The Insurance shall include provisions preventing cancellation or non - renewal without at least 45 days prior notice to the <br />State by certified mail. <br />D. The contractor will require all insurance policies in any way related to the contract and secured and maintained by the <br />contractor to include clauses stating that each carrier will waive all rights of recovery, under subrogation or otherwise, <br />against the State of Colorado, its agencies, institutions, organizations, officers, agents, employees and volunteers. <br />E. All policies evidencing the insurance coverages required hereunder shall be issued by insurance companies satisfactory to <br />the State. <br />F. The contractor shall provide certificates showing insurance coverage required by this contract to the State within ten days <br />of the notice of award. No later than 15 days prior to the expiration date of any such coverage, the contractor shall deliver <br />the State certificates of insurance evidencing renewals thereof. At any time during the term of this contract, the State may <br />request in writing, and the contractor shall thereupon within 10 days supply to the State, evidence satisfactory to the State <br />of compliance with the provisions of this section. <br />Bidders are advised to consult with their insurance carrier concerning these requirements. Submit a bid only if you are prepared <br />to complete these requirements. <br />5. WORK SCHEDULE <br />After a Purchase Order has been issued, the PROJECT MANAGER will notify the Contractor. Under no circumstances shall the <br />CONTRACTOR begin work before a P.O. is issued. If the Bid Solicitation Memorandum specifies project dates or a certain project <br />schedule, the successful bidder shall perform the work during the specified time period. DRMS reserves the right to cancel the Purchase <br />Order if the Contractor fails to begin the work as scheduled. <br />6. ACCIDENT PREVENTION AND SAFETY MEASURES ° <br />The Contractor shall comply with applicable provisions of OSHA Part 1926, Construction Standards and Interpretations, in effect on the <br />date of the Bid Opening. The Contractor shall continuously maintain, at his expense, adequate protection of the work and the Principle <br />Representative's property, and shall take all practicable precautions in the interest of safety. <br />Any shafts which were fenced prior to construction activities shall be protected by a temporary fence during non - working hours, without <br />relieving the Contractor of its legal or contractual duties to take safety precautions. Other openings may be designated by the Project <br />Manager as requiring fencing due to proximity of houses or visitation by tourists. <br />Work may involve activities around unprotected hazardous mine shafts, stopes, adds and other openings which may be open to the <br />surface or hidden from view by trash, debris, vegetation, or thin and unstable layers of surficial materials or rock. The Contractor shall be <br />responsible for thoroughly investigating the site conditions and scheduling and directing his equipment, equipment operations, personnel <br />and safety procedures to prevent accidents and injuries. Failure to comply will be cause for immediate suspension of the work. <br />7. PLANS AND WORKING DRAWINGS <br />The drawings if any, included with this contract are complete and adequate for construction. While every effort has been made to have <br />the plans and drawings free of errors and ambiguities, any such errors or ambiguities must be brought to the Project Manager's attention <br />immediately. <br />8. CORRESPONDENCE FROM THE CONTRACTOR <br />All correspondence from the Contractor to the State shall be submitted to: <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, Colorado 80203 <br />(303) 866 -3567 <br />Fax (303) 832 -8106 <br />9. MATERIALS <br />Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, <br />transportation and other facilities necessary for the execution and completion of the work. <br />Unless otherwise specified, all materials shall be new and both workmanship and materials, shall be of good and uniform quality. The <br />Contractor shall, if required, fumish satisfactory evidence as to the kind and quality of materials. <br />10. PREFERENCE OF BIDDERS AND MATERIALS <br />The selection of materials and equipment for the work shall be in accordance with the laws of Colorado and the Buy American Act <br />13 <br />