Laserfiche WebLink
Return by January 27, 2009 at 3:30 P.M. to: Receipt of Addenda Nos. <br />is hereby acknowledged <br />Yvonne Brannon <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., #215 <br />Denver, CO 80203 <br />Fax (303) 832 -8106 <br />FRUITA MINE MAINTENANCE <br />BOND REVOCATION PROJECT; M- 1981 -015 <br />PKA -9 -1149 <br />BID SCHEDULE <br />Item <br />Description <br />QTY <br />Unit <br />Unit Price <br />Amount <br />1. <br />Mobilization /Demobilization <br />1 <br />Job <br />N/A <br />$ <br />2. <br />Sediment Pond Maintenance <br />1 <br />Job <br />N/A <br />$ <br />3. <br />Rock Check Dam Construction <br />3a. <br />Road/Fill Outslope Check Dams <br />15 <br />Each <br />$ leach <br />$ <br />3b. <br />Portal Bench Che Dams <br />5 <br />Each <br />$ /each <br />$ <br />4. <br />Drainage Channel Repair and <br />Construction <br />250 <br />Ln.Ft <br />$ /LF <br />$ <br />5. <br />Portal Repair and Rock Apron <br />1 <br />Job <br />N/A <br />$ <br />6. <br />Revegetation- fertilizing, seeding, <br />mulching and crimping 1 acre <br />1 <br />Acre <br />$ /acre <br />$ <br />Additional Items (if required) <br />7. <br />Equipment Rental- Excavator, CAT <br />320BL or equivalent sized w/ <br />minimum 20' reach, turbo charged <br />and operator <br />10 <br />Hours <br />$ /hr. <br />$ <br />8. <br />Provide and install additional rip -rap <br />per specs if required at the and <br />10 <br />CY <br />N/A <br />$ <br />THIS BID SCHEDULE MUST BE RETURNED <br />Page 1 of 2 Pages <br />