My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-20_GENERAL DOCUMENTS - C1981015 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981015
>
2009-03-20_GENERAL DOCUMENTS - C1981015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:37 PM
Creation date
4/14/2010 10:55:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Date
3/20/2009
Doc Name
PKA-9-1149 Change Orders
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY CHANGE ORDER <br />COLORADO DIVISION OF <br />RECLAMATION, MINING <br />COLORADO <br />ul VI S 0 or <br />$SAFETY <br />RECLAMATION <br />1313 Sherman St. Rm. 215 <br />MINING <br />Denver, CO 80203 2273 <br />SA ETY <br />(303) 866 -3567 <br />Project Name: <br />Date: <br />Fruita Maintenance Bond Revocation Project <br />March 20, 2009 <br />Contractor Name: <br />Bid #: <br />K & P Property Designs <br />PKA -9 -1149 <br />Contractor Address: <br />Agreement #: <br />236 S. 3 #219 <br />Montrose, CO 81401 <br />Project Manager: <br />Change Order #: 3 <br />Erica Crosb <br />w auuionze worK changed due to changed conditions within the scope of the Agreement. Emergency Change Orders resulting in increased <br />5R ` M ' S "' � P ' R "' 0 "' J ' <br />rement price or Completion time must be approved by a formal Change Order WITHIN 14 days. The following changes are authorized at the direction of the <br />ECT MANAGER. <br />Item No. DESCRIPTION AND JUSTIFICATION OF CHANGES $ Increase /Decrease <br />Construct a ditch 49 feet long * 2 feet deep * 4 feet wide on the old <br />exploration road above the fill as specified by the Project Manager. The <br />hand labor cost of $384.00 ($48 /hr. * 8 hours) will be converted from a <br />portion of additional rip -rap cost (Item #8 on the additional which totals <br />$500.00). There is no increase to the total cost since $384.00 will be used <br />from Item #8. <br />The contractor will perform additional excavation work at the sediment pond <br />as directed by Project Manager. Any excavated organic materials will be <br />hauled off site for disposal. Excavated areas will be filled to blend with <br />2. adjacent contour, and reseeded as per specifications. Machine time, <br />estimated at 5 hours of Track Excavator at $100 per hour, will be used to <br />fund this work. There is no increase to the total cost since $500.00 will be <br />used from Item #7, Equipment Rental. <br />01� 0 <br />$0.00 <br />Net Change in Agreement Price: $0 Net Change in Agreement Time: 2 da <br />This document shall become an amendment to the Agreement. All Agreement provisions shall aDDly. <br />Approved by: , DRMS Project <br />Manaaer <br />Accepted by:�j��-� , Contractor <br />Date: <br />Date: 3 9 V /0 <br />As of 01/08/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.