Laserfiche WebLink
These items are all addressed separately beginning on page 19 of this response. <br />(S) Groundwater information <br />Please see attached "memo from DAMS Geochemist David Bird" and address issues noted. <br />These items are all addressed separately beginning on page 19 of this response. <br />(9) Groundwater Quality Data <br />Please see attached "memo from DRMS Geochemist David Bird" and address issues noted <br />These items are all addressed separately beginning on page 19 of this response. <br />(10) Surface Water Controls and Containment Facilities <br />Please see Memo from "DRMS Engineer Allen Sorensen" regarding facilities evaluations. <br />These items are all addressed separately beginning on page 19 of this response. <br />(12) Water Quality Monitoring Plan <br />Please clarify that monitor wells will be sampled the first month of each quarter. Nuvemco <br />will submit the results of sampling within 10 working days to DAMS. Sampling will continue <br />on a quarterly basis until adequate baseline data is gathered as determined by the applicant <br />and DRMSjoindy. To change the sampling interval a Technical Revision will be required. <br />See preceding section 6.4.7 for data already obtained and acknowledgement of continued <br />sampling requirements. <br />(14) Geochemical data and analysis <br />Please see attached "memo from DRMS Geochemist David Bird" and address issues noted. <br />(15) Construction Schedule Information <br />Please address anticipated scheduling for storm water structures Note that DRMS staff must <br />be notified in writing a minimum of ten (10) working days of construction of any surface <br />facility. It is at DRUS discretion whether staff will be on site to monitor construction. <br />Storm water structures will not be constructed before resumption of mining operations under this <br />permit application. DRMS staff will be notified prior to starting construction of any surface <br />facilities. <br />(16) QA/QC <br />Please note that engineer certified as -built drawings of all stormwater structures must be <br />submitted to DRMS within thirty (30) days of construction as proof of QAIQC monitoring. <br />15 <br />