Laserfiche WebLink
(3) Other Agency protection measures and monitoring <br />BLM measures are noted as being genera! Please provide documentation from BLM of <br />approval. If BLM has not approved, Nuvemco mast submit letter within five working ,days of <br />receipt for inclusion into this section. <br />Attached as DRMS Response Supplement (3) is an email from Robert Ernst, BLM -UFO <br />geologist regarding the status of the Environmental Assessment (EA) prepared for Nuvemco's <br />Last Chance Mining and Drilling Plan. Responses should be complete by late April and the next <br />stage of filing begun. A copy of this 112d Application with Comments and Responses will be <br />submitted to the BLM upon completion and may necessitate some further actions on the EA. <br />Nuvemco will provide documentation of BLM approval within live working days of receipt. <br />Here is a link to the .pdf of the public notification letter document: <br />htti); // www .binr.( - , ov /st; Ie /nie dial ib /bin - i/c€ /information) /iie a.lunco� - ,re #ield/azfo nepa doc <br />i le. dat , 'Final%20Last °, 2 OChance % 20,Ap)e.all /o2OL,etter.l)df <br />Here is a link to the page that has this document as a link in case the above link does not link: <br />1 ._ /J/ )y vJ2Im ovi eofst!en /fotailo.htraal <br />(4) Other Permits and Licenses <br />Please provide documentation that EPA Radon .Emissions Modeling, under the National <br />Emission Standards far Hazardous Air Pollutants, is not required. <br />See Subpart B — National Emission Standards for Radon Emissions from Underground Uranium <br />Mines included above in 6.4.13 Exhibit M. Last Chance Ore tonnages are not projected to meet <br />threshold reporting requirements. <br />(6) Uranium Handling <br />(a) Please clarify: :What procedures for the disposal, decommissioning, detoxification or <br />stabilization of the permit area will be undertaken to bring the site back to background levels <br />for radiation emissions. <br />Another and more detailed radiologic survey of the mining area will be conducted to establish <br />background radiation levels. As part of the reclamation process, the temporary ore stockpile and <br />ore loading areas will be over - excavated to remove any residual radioactive material from that <br />area with the material placed back in the mine. Continuous handheld surveys will be conducted <br />during excavation to insure all material is removed. After re- contouring the area and covering <br />with topsoil, another radiometric survey of the same scope as described in 3.1.5 (5) will be <br />conducted to confirm radiation levels approximating the background surveys. <br />13 <br />