Laserfiche WebLink
The topographic high of the reclamation above the waste rock and portal areas precludes any <br />stormwater flows other than direct precipitation from impacting these sites. No permanent <br />stormwater features are required. <br />6.4.7 -- Exhibit G, Water information <br />Please submit data for quarterly monitoring of noted wells. Specific information such as dates <br />and sampling methodology used should be included. The data will help support the statement <br />for subparagraph (1). <br />Groundwater Monitoring - Davis Mesa <br />Date MMW -1 MMW -2 Comments <br />well permit # well permit # <br />1/4/10 282308 282307 <br />Colo Div Wtr Res NOI <br />Drilled & constructed <br />See GWS-31 report & chemical <br />analyses; insufficient water for <br />valid analysis <br />Monitoring holes converted to <br />monitoring wells with SEO- <br />CDWR <br />Snow cover prevented access for first quarter 2010 sampling. <br />Monitoring Wells will be measured in April 2010, during the first month of each <br />quarter and data submitted to DRMS within 10 days of measurement and /or <br />receipt of analytical results. <br />6.4. & — Exhibit H, Wildlife: (1). <br />(2) The Division does not have CDOW original comments Please submit a copy for the <br />record. Also, please note any BLM requirements related to wildlife impacts and mitigation. <br />A copy of CDOW comment letter is attached as DRMS Response Supplement (1). <br />As detailed in the pending BLM -UFO EA, a number of wildlife stipulations are listed (pages 6- <br />7). A formal raptor survey must be performed, and no drilling may occur within 0.5 mile of <br />1101 <br />9/12/08 <br />MH -48088 <br />MR 48032 <br />Q1 <br />1011108 <br />completed <br />completed <br />10 /l /08 <br />sampled <br />dry <br />10/2/08 <br />dry <br />dry <br />10/3/08 <br />dry <br />dry <br />10/8/08 <br />dry <br />dry <br />10/23/08 <br />dry <br />dry <br />1118/08 <br />dry <br />dry <br />Q2 <br />2/10109 <br />dry <br />dry <br />Q3 <br />4/2109 <br />dry <br />dry <br />4/15/09 <br />not measured <br />dry <br />5/18109 <br />dry <br />dry <br />Q4 <br />8/20/09 <br />dry <br />dry <br />9 /10 /09 <br />not measured <br />dry <br />Q5 <br />1012/09 <br />dry <br />dry <br />11/10/09 <br />not measured <br />dry <br />well permit # well permit # <br />1/4/10 282308 282307 <br />Colo Div Wtr Res NOI <br />Drilled & constructed <br />See GWS-31 report & chemical <br />analyses; insufficient water for <br />valid analysis <br />Monitoring holes converted to <br />monitoring wells with SEO- <br />CDWR <br />Snow cover prevented access for first quarter 2010 sampling. <br />Monitoring Wells will be measured in April 2010, during the first month of each <br />quarter and data submitted to DRMS within 10 days of measurement and /or <br />receipt of analytical results. <br />6.4. & — Exhibit H, Wildlife: (1). <br />(2) The Division does not have CDOW original comments Please submit a copy for the <br />record. Also, please note any BLM requirements related to wildlife impacts and mitigation. <br />A copy of CDOW comment letter is attached as DRMS Response Supplement (1). <br />As detailed in the pending BLM -UFO EA, a number of wildlife stipulations are listed (pages 6- <br />7). A formal raptor survey must be performed, and no drilling may occur within 0.5 mile of <br />1101 <br />