My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_REVISION - M2008078 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2010-04-09_REVISION - M2008078 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:30 PM
Creation date
4/12/2010 11:00:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
REVISION
Doc Date
4/9/2010
Doc Name
Submittal
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. <br />Reclamation Bond Quantities and Costs <br />L2010 JAT Consulting, Inc. <br />GP Ranches LLCI <br />West Farm F <br />4/8/201 <br />07115 GP Ranches Rec Bond Calcs <br />Summary of Unit Costs <br />Direct costs <br />Scarifying Ground <br />Re-applying topsoil 12" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Liner Cost - Shell zone <br />Liner Cost - Core zone <br />Mobilization <br />Liner Cost Breakdown <br />Shell zone <br />Hauling and placement of overburden <br />Blending and moisture conditioning <br />Compaction to desired density <br />QA/QC <br />Core zone <br />Ripping Clay and Shale <br />Hauling and placement of clay <br />Blending and moisture conditioning <br />Compaction to desired density <br />QA/QC <br />Overhead and Profit Costs <br />Liability insurance <br />Performance bond <br />Profit <br />Project Management <br />Engineering and bidding <br />Management and administration <br /> $200 / acre <br /> $2,000.00 / acre <br /> $1,000.00 / acre <br /> $350.00 / million gallons <br /> $2.25 / cubic yard <br /> $3.25 / cubic yard <br /> $2,500 lump sum <br /> $0.50 / cubic yard <br /> $0.50 / cubic yard <br /> $1.00 / cubic yard <br /> $0.25 / cubic yard <br />Total Shell Zone Cost $2.25 / cubic yard <br /> $1.00 / cubic yard <br /> $0.50 / cubic yard <br /> $0.50 / cubic yard <br /> $1.00 / cubic yard <br /> $0.25 / cubic yard <br />Total Core Zone Cost $3.25 / cubic yard <br /> 1.55% of direct cost <br /> 1.05% of direct cost <br /> 10.00% of direct cost <br />Total Overhead Cost 12.60% of direct cost <br /> 4.25% of direct cost <br /> 5.00% of direct cost <br />Total Additional Cost 9.25% of direct cost <br />1 of 11
The URL can be used to link to this page
Your browser does not support the video tag.