Laserfiche WebLink
Project: j? . - GEOTECiH Client/ On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Civil, Structural & Geotechnical Engineers <br />co 81401 <br />e <br />tro <br />• M <br />s <br />P <br />k A Contractor / Rep: <br />Bowie Resources / Tracy Matekoovic <br />Project No: <br />2005126-CMT Date: <br />1/26/2010 , <br />on <br />ve. <br />s <br />222 <br />outh <br />ar <br />Ph.: (970) 249-6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY COMPACTIO N REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TESL <br />NUMBER Embankment Gob -Gob Pile No. 2 <br />Center Slope GRADE ELEV <br />NUC <br />SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />WO CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />337 (PT#4480 N19302.66/E37687.69 6069.4 X 95.3 11.3 87.3 21.5 91.6 gob #330a & 335 r/C @12° <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVAT ION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% Cohesive Solis X <br />Requirement: Cohesionless Soils Full Time: Day: 5 M T <br />X W Th F S <br />Sheepsfoot: F X-1 <br /> Part Time: Weather: Sun Gear Overcast Rain Snow <br />Specified X X X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site VistLs/Day: Q Temp: To 32 <br />x 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind: Still Mod High <br /> Requested By (Company Name): X X Other (list Below): 0 <br />Procedure: Laboratory Testing D ASTM 698 - Cnnacjve SOijs X <br /> <br />Cohesionless Soils R, Bear/ Bowie Resources <br />- - Humiditv: Dry <br /> <br />X' Mod <br /> <br />x Humid Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED 7 <br />ON THIS DATE FOR THE FOLLOWING REASONS: nsu ffi cient amount <br />material placed. <br />F Informed (Rep of Company) of-rest Results: <br /> <br /> <br />Tracy Matekoovic / B. Bear <br /> <br /> <br />uckharn was not informed prior <br />h <br />h <br />Contractor Not Working Due To: The Contractor Is: Bowie Resources to our arrival on site t <br />at t <br />e <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: =Processing Wet Material: <br /> <br />stripping and/or Grubbing: Moisture conditioning Dry Man: Field Copies Given To: <br /> <br />Contractor:. <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable Mal: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.xis DCR1-26-101s#337