Laserfiche WebLink
Project: ,- - - _ --- .. - - -- - - -- <br />GEOTECH <br />' f <br />I <br />Client / On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability <br />Civil, Structural & Geotechnical Engineers <br />co 81401 <br />- Montrose <br />222 South Park Ave Contractor / Rep: <br /> <br />Bowie Resources / Tracy Matekoovic <br />Project No: <br />2005126-CMT Date: <br />2/17/2010 . <br />. <br />Ph.: (970) 249-6829 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY CO MPACTIO N REPORT <br /> LOCATION TEST MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER Embankment Gob - Gob Pile No. 2 <br />Bottom of South Slope GRADE ELEV <br />NC DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />345 PT#4491 N 19288.02/E37563.44 6076.1 X 96.2 10.5 95.8 10.7 99.6 gob #339 & 340 r/c @12% <br />346 (PT#4492) N 19349.67/E37662.43 6080.3 X 96.0 11.1 91.5 11.2 95.3 gob #330a & 335 r/c @140/ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: 2/ 17/20 10 Compaction Equipment Used: <br />Compaction Cohesive Soils X <br />Requirement: 90% + Cohesionless Soils Full Time: Day: <br />S M T W <br />X Th F S <br />Sheepsfoot: X <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />Specified X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only: EE Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />?cTr? <br />Laboratory Testing „a III - Cohesive Soils X <br />Procedure: D 698 <br />Cohesionless Soils B. Bear/ Bowie Resources Humidity: Dry <br /> <br />X Mod Humid Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />lof material placed. Informed (Rep of Company) of Test Results: <br />Tracy Matekoovic / B. Bear <br />Bu was not informed prior <br />r arrival on site that the <br />to o <br />Contractor Not Working Due To: The Contractor Is: Bowie Resources u <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: Processing Wet Material: <br /> <br />Stripping and/or Grubbing: Moisture Conditioning Dry Maul: Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable MaYI: CM/GM: <br />Other: PAGE I OF 1 <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability.xls DCR2-17-101s#345