My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-05_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2010-04-05_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:21 PM
Creation date
4/9/2010 9:09:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
4/5/2010
Doc Name
Comment letter
From
DRMS
To
Mountain Coal Coompany
Type & Sequence
TR120
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />April 5, 2010 <br />Kathleen G. Welt <br />Mountain Coal Company, LLC <br />P.O. Box 591 <br />Somerset, CO 81434 <br />Re: West Elk Mine (Permit No. C-1980-007) <br />Technical Revision No. 120 (TR-120) <br />Refuse Pile Expansion East <br />Dear Ms. Welt: <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />James B. Martin <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has the following comments regarding Barr Engineering's letter of March 19, 2010 and Mountain Coal <br />Company's letter of March 23, 2010. Numbering follows the Division's previous comments. <br />8. a) Please provide revised SEDCAD runs (or other similar analyses) for Appendix F that evaluate the east and <br />west sediment ditches as pipes (rather than ditches), and revise associated text references. <br />b) To ensure compliance with Rule 4.09.2(7), please revise the design of the east and west sediment pipes so <br />they are off the fill. Also, please add to Section 3.2 the diameter of the sediment pipes, the dimensions of the <br />manholes, and identify the construction materials of these structures. <br />c) Please add to Appendix F a SEDCAD run (or other similar analyses) for the east and west clear water <br />diversion ditches that includes runoff from the surface of the reclaimed RPE East after final reclamation (see <br />following comment 11). <br />11. Please add to Section 8.1 the following commitments: <br />a) After final reclamation is complete, a technical revision will be submitted that demonstrates routing of <br />surface runoff from the RPE East to a sediment control pond is no longer needed for complying with water <br />quality regulations. <br />b) Upon approval of the previously mentioned technical revision, the east and west sediment drainage pipes and <br />manhole covers will be removed, and the perimeter of the refuse pile will be re-graded so that surface <br />drainage is routed to the 100-year clear water ditches. <br />The Division is preparing a reclamation cost estimate for TR-120. <br />Sincerely, <br />TV", /c 4" <br />Tom Kaldenbach <br />Environmental Protection Specialist <br />cc (via email): Dan Hernandez, DRMS <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.