Laserfiche WebLink
.;::.;:.;>::.::: ::::::::::::.::::::::.::.:........................... ..... . <br />sheet 2 of 2 <br />ROADABLE EQUIPMENT <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description C ost/houdunit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $57.74 1 $57.74 $57.74 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals : $57.74 $57.74 <br /> <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Montrose <br />Transportation Cycle Time : Non- Total one-way travel distance : 44.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> <br /> Equipment Equipment <br />rs) = <br />h <br />l ti <br />H 98 <br />0 98 <br />0 Total non-roadable mob/demob cost $1,120.12 <br />ou <br />me ( <br />au . . <br />Return time (hours) = 0.98 0.98 * two round trips with haul rig <br />h <br />= <br />i 50 <br />0 NA Total roadable mob/demob cost ** : $112.91 <br />ours) <br />me ( <br />Loading t . <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 2.96 1.96 <br /> <br />JOB TIME AND COST Total job time : 5.91 hours <br /> Total job cost : $1,233 <br />