Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 243 State : Colorado Permit/job# : C-1981-022 <br />Date : 04/06/2010 County :Delta Abbreviation :none <br />User : JRS Site :Elk Creek Mine Filename :C022-243 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 67 _ <br />Task description : Regrade Light Use Roads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 4,300 <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 4 <br />0 <br />5 <br /> <br />Blade type : Semi-Universal . <br />_ <br />_ _ _ <br />-- <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Ownership costihour : $67.77 NA <br />Operating cost/hour: $95.29 ? v100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour: $38.54 NA <br />Total unit costihour : $201.60 Total fleet costihour : $201.60 <br /> <br />CCY <br />Swell Loose <br />factor : 1.165 volume : <br />5,010 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : <br />' 0.75 (avg-) <br />Average push distance : 100 feet Material consistency: <br />onsistency : 0.90 at HB) <br />(C <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 _ <br />(gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (ishift/day) <br />Compacted rill or embankment Spoil pile : 0.80 (fn_d-M <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,800 feet Material weight : 0.79 _ <br />(Cat HB) <br /> Blade type : 1.00 (SISUAU) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.31 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earlh Adjusted unit production : 379.20 LCY/hr <br /> Adjusted fleet production : 379.20 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 13.21 Hours <br />unit cost : $0.532 /LCY Total job cost : $2,663 <br />